Minnesota/1 June 2009

From 2009.igem.org

(Difference between revisions)
 
(5 intermediate revisions not shown)
Line 1: Line 1:
{|style="align:left" width="965"
{|style="align:left" width="965"
|-
|-
-
|'''[[Team:Minnesota/NotebookComparator|  Back to Notebook Home]]'''
+
|'''[[Team:Minnesota/Modeling|  Back to Notebook Home]]'''
|-
|-
-
|'''[[Minnesota/19 June 2008|Go to Previous Day (June 19)]]'''|| width=158|'''[[Minnesota/2 June 2009|Go to Next Day (June 2)]]'''
+
|''|| width=158|'''[[Minnesota/2 June 2009|Go to Next Day (June 2)]]'''
|}
|}
 +
 +
Today is the start of the iGEM modeling team's work for the summer on the modeling of the AND gate. It was spent introducing everyone to the program here in Minnesota, and some basic other logistical things like where everyone would work and how to get everyone keys.
 +
No real modeling progress was made this day.

Latest revision as of 17:12, 28 July 2009

Back to Notebook Home
Go to Next Day (June 2)

Today is the start of the iGEM modeling team's work for the summer on the modeling of the AND gate. It was spent introducing everyone to the program here in Minnesota, and some basic other logistical things like where everyone would work and how to get everyone keys. No real modeling progress was made this day.