Team:Paris/15 July 2009
From 2009.igem.org
(Difference between revisions)
Christophe.R (Talk | contribs) (→Comment) |
Christophe.R (Talk | contribs) (→Summary) |
||
(7 intermediate revisions not shown) | |||
Line 3: | Line 3: | ||
==NoteBook== | ==NoteBook== | ||
- | + | {{Paris2009_Calendar}} | |
- | { | + | {{Paris2009_Calendar_Link|14_July_2009|16_July_2009}} |
- | + | <center> '''July 15th''' </center> | |
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
<html> | <html> | ||
</div> | </div> | ||
Line 19: | Line 13: | ||
</html> | </html> | ||
- | == | + | === Summary === |
The big boss is here.<br> | The big boss is here.<br> | ||
10 AM : | 10 AM : | ||
- | meeting time first episode.<br> After a little cheers on the fact that our project seems not to be so bad but the Pekin team will run over us (they seems to work until 11PM O_o), we had a little overview on our diffrents parts (Yea right ! We need a supervisor on wich we can yell at if it doesn't work !)<br> | + | meeting time first episode.<br> After a little cheers on the fact that our project seems not to be so bad but the Pekin team will run over us (they seems to work until 11PM O_o), we had a little overview on our diffrents parts (Yea right ! We need a supervisor for each part on wich we can yell at if it doesn't work !)<br> |
<br> | <br> | ||
We cut our project in 5 parts: | We cut our project in 5 parts: | ||
Line 33: | Line 27: | ||
- | |||
5PM: Meeting strick back !<br> | 5PM: Meeting strick back !<br> | ||
- | We did our powerpoint | + | We did our powerpoint, 3 hours of works on 5 differents teams for a 31 pages presentation... what a mess !<br><br> |
2 idears of Mr When-i'm-here-we-don't-laught: | 2 idears of Mr When-i'm-here-we-don't-laught: | ||
Line 43: | Line 36: | ||
thaaaaat's a realy good proposition ! realy not those we'll gonna trough away in the garbage... | thaaaaat's a realy good proposition ! realy not those we'll gonna trough away in the garbage... | ||
+ | |||
+ | |||
+ | {{Paris2009_Calendar_Link|14_July_2009|16_July_2009}} |
Latest revision as of 15:15, 7 August 2009
NoteBook
|
|
|
|
|
---|
Summary
The big boss is here.
10 AM :
meeting time first episode.
After a little cheers on the fact that our project seems not to be so bad but the Pekin team will run over us (they seems to work until 11PM O_o), we had a little overview on our diffrents parts (Yea right ! We need a supervisor for each part on wich we can yell at if it doesn't work !)
We cut our project in 5 parts:
- OMV Production
- Signal Transduction
- Periplasm signal
- Fusion vesicle
- Control mecanism on targeting protein in vesicle
5PM: Meeting strick back !
We did our powerpoint, 3 hours of works on 5 differents teams for a 31 pages presentation... what a mess !
2 idears of Mr When-i'm-here-we-don't-laught:
- why not sending an enzyme into the periplasm which finaly creat a signal in it (eg, cutable signalisation protein witch becam activated)
- why don't we send a working PBP ?
thaaaaat's a realy good proposition ! realy not those we'll gonna trough away in the garbage...