Virginia Commonwealth/30 July 2009
From 2009.igem.org
(Difference between revisions)
(→Thursday 30 July 2009) |
(→Thursday 30 July 2009) |
||
Line 47: | Line 47: | ||
* Take spectrophotometry measurements of I1352 and pSB4C5 | * Take spectrophotometry measurements of I1352 and pSB4C5 | ||
* Digest and Ligate I1352 and pSB4C5 | * Digest and Ligate I1352 and pSB4C5 | ||
+ | * Run a Gel Electrophoresis on pSB4C5 and I1352 using the Hyper Ladder and the 100bp ladder | ||
* Transform parts into NEB 10 beta | * Transform parts into NEB 10 beta | ||
[[User:Trentay|Trentay]] 14:26, 31 July 2009 (UTC) | [[User:Trentay|Trentay]] 14:26, 31 July 2009 (UTC) | ||
Line 57: | Line 58: | ||
** The two samples were combined into one tube before measurements were taken | ** The two samples were combined into one tube before measurements were taken | ||
** pSB4C5 that was miniprepped on July 27, 2009 | ** pSB4C5 that was miniprepped on July 27, 2009 | ||
- | * | + | * Digestion was done |
+ | ** Only the restriction enzymes EcoRI-HF and Pstl were used to cut the separate the backbone from the promter and RET | ||
+ | * Ligation was done | ||
+ | ** for the Ligation of I1352 with pSB4C5, 3 microliters was added of each digestion to the Ligation sample | ||
+ | ** for the Ligation of I1352 with itself, 6 microliters of the Digestion was addes to the Ligation sample |
Revision as of 15:09, 31 July 2009
|
|
|
|
|
|
Contents |
Thursday 30 July 2009
Results
- The overnight culture grew, however, no RFP was expressed (I1352)
Trentay 14:26, 31 July 2009 (UTC)
Tasks
- Make Cryogenic Stocks of part I1352 (2 vials)
- Make another overnight culture from the previous culture to see if it will express RFP
- Miniprep I1352
- Take spectrophotometry measurements of I1352 and pSB4C5
- Digest and Ligate I1352 and pSB4C5
- Run a Gel Electrophoresis on pSB4C5 and I1352 using the Hyper Ladder and the 100bp ladder
- Transform parts into NEB 10 beta
Trentay 14:26, 31 July 2009 (UTC)
Wetlab
- Cryogenic stocks were made
- Overnight culture of I1352 was grown up in 5mL of LB+AMP
- 2 samples of 1.5mL of I1352 was Miniprepped
- Spectophotometry measurements were taken
- The two samples were combined into one tube before measurements were taken
- pSB4C5 that was miniprepped on July 27, 2009
- Digestion was done
- Only the restriction enzymes EcoRI-HF and Pstl were used to cut the separate the backbone from the promter and RET
- Ligation was done
- for the Ligation of I1352 with pSB4C5, 3 microliters was added of each digestion to the Ligation sample
- for the Ligation of I1352 with itself, 6 microliters of the Digestion was addes to the Ligation sample