Team:Newcastle/Labwork/11 September 2009

From 2009.igem.org

(Difference between revisions)
(Conclusions)
(Conclusions)
Line 144: Line 144:
** Analyse PCR products through DNA gel electrophoresis
** Analyse PCR products through DNA gel electrophoresis
** Clean up PCR products if PCR reaction proves to be successful</font>
** Clean up PCR products if PCR reaction proves to be successful</font>
-
* <font color="grey">'''Midi-prep ''cotC-GFP-smtA'', ''kinA'', ''pGFP-rrnB'', ''pMUTIN4'' and ''pSB1AT3'''''
+
* <font color="gray">'''Midi-prep ''cotC-GFP-smtA'', ''kinA'', ''pGFP-rrnB'', ''pMUTIN4'' and ''pSB1AT3'''''
** Carry out the five midi-preps.
** Carry out the five midi-preps.
** Quantify the midi-prep samples
** Quantify the midi-prep samples

Revision as of 20:29, 12 October 2009


Team Newcastle 2009 iGEM ProbationaryP-Sign.PNG

Formal Lab Session - 11th September 2009

Metal Sensing Team

Introduction and Outline

So far we have transformed DH5-alpha E. coli cells with two synthesized BioBricks, which are the cotC-GFP-smtA and the kinA BioBricks. The cotC-GFP-smtA BioBrick is involved within the metal sensing sub-project whereas the kinA BioBrick is involved with the Sporulation Team's sub-project. The Metal Sensing team have since taken these transformant colonies and used them to set up LB+kanamycin cultures for mini-preps and midi-preps; these were then left overnight in the orbital shaking incubator and are awaiting processing today. However there are a range of tasks which need to be accomplished today; these are listed below:

  • Prepare Mini-preps of the kinA and cotC-GFP-smtA transformants
    • Carry out the mini-prep processes
    • Analyse the mini-prep DNA by treating with restriction enzymes.
  • PCR the cotC-GFP-smtA BioBrick with pMK15 and pMK16
    • Set up the PCR
    • Run the PCR for the correct duration
    • Analyse PCR products through DNA gel electrophoresis
    • Clean up PCR products if PCR reaction proves to be successful
  • Midi-prep cotC-GFP-smtA, kinA, pGFP-rrnB, pMUTIN4 and pSB1AT3
    • Carry out the five midi-preps.
    • Quantify the midi-prep samples
    • Run the midi-prep samples on agarose gel through DNA gel electrophoresis
  • Run products from a PCR reaction involving arsR and cadA DNA on gel
    • Run PCR products on gel
    • If successful, clean up fragments, run on gel again, cut with restriction enzymes NheI and BamHI, clean and then ligate together fragments.


Procedure

The following procedures were carried out:

Freeze the kinA and cotC-GFP-smtA transformant cells

Instead of preparing mini-prep samples from the two groups of transformant E.coli cells (i.e. kinA transformed E.coli cells and cotC-GFP-smtA transformed cells), we instead took the decision to use the inoculated 5ml LB tubes in freezing the cells. Analysis of the midi-prep samples will be used to determine whether the BioBricks have been truly transformed - this decision will both save time and also provide a back-up stock of cells for future work. This procedure was carried out by James using the protocol

PCR the cotC-GFP-smtA BioBrick with pMK15 and pMK16

Midi-prep cotC-GFP-smtA, kinA, pGFP-rrnB, pMUTIN4 and pSB1AT3

The midi-preps were conducted, as usual, using the Sigma-Aldrich Midi-prep kit and protocol. There were no changes to the protocol and 10ul samples of the five midi-prepped plasmids were loaded onto 0.8% agarose gel (see the 'Results' section below). The midi-prepped DNA samples were also assessed for DNA concentration using the NanoDrop spectrophotometer.

cotC-GFP-smtA

CotC Quantity DNA 11-09-09.JPG The following diagram shows the concentration of the cotC midi-prep sample as well as the DNA to Protein ratios; at 89.7 ng/ul the DNA concentration is at a suitable level for further processing. When analysed through DNA gel electrophoresis (see 'Results' section below) it can be seen that the band produced by the cotC-GFP-smtA within the uncut pMK-RQ plasmid lies just below the 2027bp fragment of the HindIII ladder.

Whilst the plasmid + BioBrick is 3,663bp the plasmid was uncut so it appears as a shorter fragment in the gel. To prove that the midi-prepped DNA is 3,663bp, we should carry out restriction enzyme digests on another day.

kinA

Team Newcastle 2009 iGEM KinA Quantity DNA 11-09-09.JPG The following diagram shows the concentration of the kinA midi-prep sample as well as the DNA to Protein ratios; at 20.8 ng/ul the DNA concentration is not as good as expected but still enough for further processing. When analysed through DNA gel electrophoresis (see 'Results' section below) it can be seen that the the kinA + pMK-RQ plasmid (uncut) band lies between the 2027bp and 2322bp fragment of the HindIII ladder.

Whilst the plasmid + BioBrick is 4,327bp the plasmid was uncut so it appears as a shorter fragment in the gel. Likewise, to prove that the midi-prepped DNA is 4,327bp, we should carry out restriction enzyme digests on another day.

pGFP-rrnB

Team Newcastle 2009 iGEM pGFP-rrnB Quantity DNA 11-09-09.JPG The following diagram shows the concentration of the pGFP-rrnB midi-prep sample as well as the DNA to Protein ratios; at 66.8 ng/ul the DNA concentration is at a suitable level for further processing. When analysed through DNA gel electrophoresis (see 'Results' section below) it can be seen that the band produced by the pGFP-rrnB plasmid lies near the 4361bp fragment of the HindIII ladder.

The true length of the plasmid is 8399bp but seen as the plasmid is uncut the gel again doesn't reveal its true length. Like said before, we will need to linearise the fragment with appropriate enzymes to prove it's length.

pMUTIN4

Team Newcastle 2009 iGEM pMUTIN4 Quantity DNA 11-09-09.JPG The following diagram shows the concentration of the pMUTIN4 plasmid midi-prep sample as well as the DNA to Protein ratios; at 7.2 ng/ul the DNA concentration is very low - so low it would serve little use in further processing. When analysed through DNA gel electrophoresis (see 'Results' section below) it can be seen that the band present in the lane in which pMUTIN4 was added is very faint. This is explained by the low concentration of DNA.

To deal with this problem, a second midi-prep should be attempted of the pMUTIN4 plasmid.

pSB1AT3

Team Newcastle 2009 iGEM pSB1AT3 Quantity DNA 11-09-09.JPG The following diagram shows the concentration of the pSB1AT3 midi-prep sample as well as the DNA to Protein ratios; at 67.9 ng/ul the DNA concentration is at a suitable level for further processing. When analysed through DNA gel electrophoresis (see 'Results' section below) it can be seen that the band produced by the pSB1AT3 plasmid lies between the 2027bp and 2322bp fragments of the HindIII ladder.

The plasmid size is 3,446bp but seen as the plasmid is uncut the gel again doesn't reveal its true length. Like said before, we will need to linearise the fragment with appropriate enzymes to prove it's length.

Second attempt at pMUTIN4 midi-preps

In a lab session on the 24th July 2009, we took the decision to prepare some E.coli cells containing the pMUTIN4 plasmid by taking 2 flasks of inoculated 100ml LB (inoculated with these E. coli cells and grown overnight in the previous lab session), splitting them into four 50ml falcon tubes and then spinning them down. The supernatants were then decanted and the pellets stored in the -20C freezer. Today, the Metal Sensing team will use these cells to attempt a second midi-prep.

Two of the four tubes were taken and each was treated using the Sigma-Aldrich Midi-prep kit and protocol. There were no changes to the protocol but there are two important notes to make:

  1. This midi-prep attempt started at step 2 (titled 'Resuspend Cells) in the protocol
  2. The Spin method was the preferred route (as opposed to the Vacuum method).

Once two midi-prep samples of pMUTIN4 were successfully prepared from the 2 cultures of E. coli, they were taken to the NanoDrop spectrophotometer. The following readings were produced:

Team Newcastle 2009 iGEM Second Attempt pMUTIN4 Quantity DNA 11-09-09 - sample 1.jpg
Team Newcastle 2009 iGEM Second Attempt pMUTIN4 Quantity DNA 11-09-09 - sample 2.jpg


These two midi-prep samples of pMUTIN4 contain a higher concentration of DNA than the first attempt. These concentrations are sufficient for further processing. These two samples were also run on the gel and can be found in lanes 14 and 16 in the first well of rows (see gel photograph in 'Results' section below). Whilst the two samples are found near the 4,361bp band of the HindIII DNA ladder, it has to be remembered that they are uncut so they don't reflect their true length (which is roughly bp) - the gel just shows that there is DNA present there. However the two samples are consistent in size which suggests no contamination.

Process products from a PCR reaction involving arsR BioBrick and cadA Promoter DNA

In the previous lab session, PCR reactions were carried out in an attempt to amplify a promoter-less arsR BioBrick (the BBa_J33206 BioBrick minus the promoter region) and cadA promoter region - these will form the cadmium-sensing AND gate. The plan is to run these products on a gel and if we get results, carry out the following:

  • Clean up product
  • Run in agarose gel in electrophoresis
  • Cut with NheI and BamHI
  • Clean digested product
  • Ligate cadA promoter region and a promoter-less BBa_J33206 arsR BioBrick (in pSB1A2 plasmid)


The gel photograph produced after the PCR products were run through 0.8% agarose gel showed that the PCR reactions did in fact work. The Metal Sensing team proceded to clean up the two products however not all of the ethanol was removed! This error became apparent when trying to load the gel with the cleaned up product as the sample immediately dissipated into the buffer surrounding the gel.

This means we will have to carry out another PCR reaction to obtain the arsR BioBrick (without promoter) in pSB1A2 backbone and the cadA promoter region; we shall then continue with the steps listed above. The PCR reaction was prepared and initiated in the afternoon so the products should be ready for tomorrow's lab session.

Results

We took the decision to run 4 sets of DNA samples on 0.8% agarose gel - this includes the midi-prep samples (i.e. cotC, kinA, pGFP-rrnB, pMUTIN4 and pSB1AT3), products from a PCR reaction involving cotC, futher midi-preps of pMUTIN4 and digests from midi-prepped DNA the Stochastic Switch team have prepared (i.e. sac, ara and sleB) The resulting GelDoc photograph can be seen below:

Team Newcastle 2009 iGEM Geldoc 2009-09-11 15hr 59min.jpg


The lanes are as follows:

Row 1


Row 2

  • Lane 1 = blank
  • Lane 2 = HindIII DNA Ladder
  • Lane 3 = sac midi-prep digest sample
  • Lane 4 = ara midi-prep digest sample
  • Lane 5 = sleB midi-prep sample
  • Lane 6 = HindIII DNA ladder


To get an analysis of the bands seen in the wells click on the above hyperlinks highlighted in [light blue].


Conclusions

Today's lab session has been centred around the following list of objectives:

  • Mini-prep kinA and cotC-GFP-smtA transformants
    • Carry out the mini-prep processes
    • Analyse the mini-prep DNA by treating with restriction enzymes.

Froze down kinA and cotC-GFP-smtA transformant cells instead

  • PCR the cotC-GFP-smtA BioBrick with pMK15 and pMK16
    • Set up the PCR
    • Run the PCR for the correct duration
    • Analyse PCR products through DNA gel electrophoresis
    • Clean up PCR products if PCR reaction proves to be successful
  • Midi-prep cotC-GFP-smtA, kinA, pGFP-rrnB, pMUTIN4 and pSB1AT3
    • Carry out the five midi-preps.
    • Quantify the midi-prep samples
    • Run the midi-prep samples on agarose gel through DNA gel electrophoresis
  • Run products from a PCR reaction involving arsR and cadA DNA on gel
    • Run PCR products on gel
    • If successful, clean up fragments, run on gel again, cut with restriction enzymes NheI and BamHI, clean and then ligate together fragments.


The objectives written in grey coloured text are objectives fulfilled in today's lab session, the objectives written in purple coloured text are objectives which were changed and the objectives left in black coloured text are objectives not achieved.
Tomorrow's lab session will be centred around the following objectives:

  • Run products of PCR reaction involving the arsR BioBrick (BBa_J33206 in pSB1A2 missing promoter) and cadA promoter region
    • If successful clean up product, run on agarose gel through electrophoresis, excise band and carry out gel extraction.
    • Cut cleaned and excised fragment with BamHI and NheI
    • Carry out ligation (possibly an overnight ligation)
  • Cut pMUTIN4 and cotC (i.e. PCR product 3) with BamHI and HindIII
    • Ligate the fragments (possibly overnight)

Stochastic Switch Team

We run the restriction digests stored in the freezer from Wednesday to see we really have the biobrick (sspB + pSB1AT3)

We had the results on the gel as we expected. We saw the bands for the plasmid backbone which were all equal in 11 columns. The 11th column had mCherry + pSB1AT3. mCherry has around 1000b and sspB has around 550bp which can also be confirmed from the gel.

This result meant we had our first manual biobrick! sspB + pSB1AT3 ligation worked and when we cut the ligated product we had the bands as we expected.

Team Newcastle iGEM 2009 11-09-09 SS 1.png


Today we did restriction digests using fast digest enzymes of pGFP-rrnb (EcoRI + NheI) pMKRQ+kinA (EcoRI + NheI) and James and Hanny's sleB (EcoRI + NheI). Gel extraction was done on pGFP-rrnb.

July
MTWTFSS
    [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/1_July_2009&action=edit 1] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/2_July_2009&action=edit 2] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/3_July_2009&action=edit 3] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/4_July_2009&action=edit 4] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/5_July_2009&action=edit 5]
[http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/6_July_2009&action=edit 6] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/7_July_2009&action=edit 7] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/8_July_2009&action=edit 8] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/9_July_2009&action=edit 9] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/10_July_2009&action=edit 10] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/11_July_2009&action=edit 11] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/12_July_2009&action=edit 12]
[http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/13_July_2009&action=edit 13] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/14_July_2009&action=edit 14] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/15_July_2009&action=edit 15] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/16_July_2009&action=edit 16] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/17_July_2009&action=edit 17] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/18_July_2009&action=edit 18] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/19_July_2009&action=edit 19]
[http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/20_July_2009&action=edit 20] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/21_July_2009&action=edit 21] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/22_July_2009&action=edit 22] [http://2009.igem.org/Team:Newcastle/Labwork/23_July_2009 23] [http://2009.igem.org/Team:Newcastle/Labwork/24_July_2009 24] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/25_July_2009&action=edit 25] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/26_July_2009&action=edit 26]
[http://2009.igem.org/Team:Newcastle/Labwork/27_July_2009 27] [http://2009.igem.org/Team:Newcastle/Labwork/28_July_2009 28] [http://2009.igem.org/Team:Newcastle/Labwork/29_July_2009 29] [http://2009.igem.org/Team:Newcastle/Labwork/30_July_2009 30] [http://2009.igem.org/Team:Newcastle/Labwork/31_July_2009 31]
August
MTWTFSS
          [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/1_August_2009&action=edit 1] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/2_August_2009&action=edit 2]
[http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/3_August_2009&action=edit 3] [http://2009.igem.org/Team:Newcastle/Labwork/4_August_2009 4] [http://2009.igem.org/Team:Newcastle/Labwork/5_August_2009 5] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/6_August_2009&action=edit 6] [http://2009.igem.org/Team:Newcastle/Labwork/7_August_2009 7] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/8_August_2009&action=edit 8] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/9_August_2009&action=edit 9]
[http://2009.igem.org/Team:Newcastle/Labwork/10_August_2009 10] [http://2009.igem.org/Team:Newcastle/Labwork/11_August_2009 11] [http://2009.igem.org/Team:Newcastle/Labwork/12_August_2009 12] [http://2009.igem.org/Team:Newcastle/Labwork/13_August_2009 13] [http://2009.igem.org/Team:Newcastle/Labwork/14_August_2009 14] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/15_August_2009&action=edit 15] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/16_August_2009&action=edit 16]
[http://2009.igem.org/Team:Newcastle/Labwork/17_August_2009 17] [http://2009.igem.org/Team:Newcastle/Labwork/18_August_2009 18] [http://2009.igem.org/Team:Newcastle/Labwork/19_August_2009 19] [http://2009.igem.org/Team:Newcastle/Labwork/20_August_2009 20] [http://2009.igem.org/Team:Newcastle/Labwork/21_August_2009 21] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/22_August_2009&action=edit 22] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/23_August_2009&action=edit 23]
[http://2009.igem.org/Team:Newcastle/Labwork/24_August_2009 24] [http://2009.igem.org/Team:Newcastle/Labwork/25_August_2009 25] [http://2009.igem.org/Team:Newcastle/Labwork/26_August_2009 26] [http://2009.igem.org/Team:Newcastle/Labwork/27_August_2009 27] [http://2009.igem.org/Team:Newcastle/Labwork/28_August_2009 28] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/29_August_2009&action=edit 29] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/30_August_2009&action=edit 30]
[http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/31_August_2009&action=edit 31]
September
MTWTFSS
  [http://2009.igem.org/Team:Newcastle/Labwork/1_September_2009 1] [http://2009.igem.org/Team:Newcastle/Labwork/2_September_2009 2] [http://2009.igem.org/Team:Newcastle/Labwork/3_September_2009 3] [http://2009.igem.org/Team:Newcastle/Labwork/4_September_2009 4] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/5_September_2009&action=edit 5] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/6_September_2009&action=edit 6]
[http://2009.igem.org/Team:Newcastle/Labwork/7_September_2009 7] [http://2009.igem.org/Team:Newcastle/Labwork/8_September_2009 8] [http://2009.igem.org/Team:Newcastle/Labwork/9_September_2009 9] [http://2009.igem.org/Team:Newcastle/Labwork/10_September_2009 10] [http://2009.igem.org/Team:Newcastle/Labwork/11_September_2009 11] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/12_September_2009&action=edit 12] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/13_September_2009&action=edit 13]
[http://2009.igem.org/Team:Newcastle/Labwork/14_September_2009 14] [http://2009.igem.org/Team:Newcastle/Labwork/15_September_2009 15] [http://2009.igem.org/Team:Newcastle/Labwork/16_September_2009 16] [http://2009.igem.org/Team:Newcastle/Labwork/17_September_2009 17] [http://2009.igem.org/Team:Newcastle/Labwork/18_September_2009 18] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/19_September_2009&action=edit 19] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/20_September_2009&action=edit 20]
[http://2009.igem.org/Team:Newcastle/Labwork/21_September_2009 21] [http://2009.igem.org/Team:Newcastle/Labwork/22_September_2009 22] [http://2009.igem.org/Team:Newcastle/Labwork/23_September_2009 23] [http://2009.igem.org/Team:Newcastle/Labwork/24_September_2009 24] [http://2009.igem.org/Team:Newcastle/Labwork/25_September_2009 25] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/26_September_2009&action=edit 26] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/27_September_2009&action=edit 27]
[http://2009.igem.org/Team:Newcastle/Labwork/28_September_2009 28] [http://2009.igem.org/Team:Newcastle/Labwork/29_September_2009 29] [http://2009.igem.org/Team:Newcastle/Labwork/30_September_2009 30]



News

Events

Social Net

  • Newcastle iGEM Twitter
  • [http://www.facebook.com/home.php#/group.php?gid=131709337641 Newcastle on Facebook]
  • [http://www.youtube.com/user/newcastle2009igem Newcastle Youtube Channel]