Team:HKUST/Future3
From 2009.igem.org
(Difference between revisions)
Line 44: | Line 44: | ||
<ul> | <ul> | ||
<li><a href="https://2009.igem.org/Team:Gallery">Gallery</a></li> | <li><a href="https://2009.igem.org/Team:Gallery">Gallery</a></li> | ||
- | <li><a href="https://2009.igem.org/Team: | + | <li><a href="https://2009.igem.org/Team:Biosafety">Biosafety</a></li> |
<li><a href="https://2009.igem.org/Team:Acknowledgement">Acknowledgement</a></li> | <li><a href="https://2009.igem.org/Team:Acknowledgement">Acknowledgement</a></li> | ||
</ul> | </ul> |
Revision as of 16:38, 19 October 2009
a
1. To finish the construction of pRS426-FUS1P-ARO9-FUS1T and pRS426-FUS1P-GFP-FUS1T reporter.
2. To finish the attractant production and reporter functional assay as described in the experiment design.
3. To further characterize the attractant production pathway, as described in the experiment design.