Team:DTU Denmark/notebookredoxilator

From 2009.igem.org

(Difference between revisions)
Line 186: Line 186:
<font size="4"><b>Activities relating to the redoxilator</b></font><br>
<font size="4"><b>Activities relating to the redoxilator</b></font><br>
 +
<font size="3"><b>July 20th</b></font><br>
 +
<p align="justify">Construction of biobricks: The restriction products were evaluated on a 1% agarose gel (see figure 2).</p><br>
 +
</html>
 +
[[image:DTUgel1.jpg]]
 +
<html>
 +
<p align="center"><i>Figure 2: Restriction analysis of the three biobricks.</i>
 +
<font size="3"><b>July 19th</b></font><br>
 +
<p align="justify">Construction of biobricks: The three plasmids were purified according to the protocol (link to protocol). Following the purification of the plasmids, a restriction analysis was performed using SpeI enzyme (10U) and incubated at 37ºC overnight.</p><br>
 +
<font size="3"><b>July 18th</b></font><br>
 +
<p align="justify">Construction of biobricks: Some colonies were picked from the transformation plates and made overnight cultures in liquid media.</p><br>
 +
<font size="3"><b>July 17th</b></font><br>
 +
<p align="justify">Construction of biobricks:        </p><br>
 +
<font size="3"><b>July 16th</b></font><br>
 +
<p align="justify">Construction of biobricks:        </p><br>
 +
 +
<font size="3"><b>July 15th</b></font><br>
 +
<p align="justify">Construction of biobricks:        </p><br>
 +
 +
<font size="3"><b>July 14th</b></font><br>
 +
<p align="justify">Construction of biobricks:        </p><br>
 +
 +
<font size="3"><b>July 13th</b></font><br>
 +
<p align="justify">Construction of biobricks:        </p><br>

Revision as of 19:19, 20 October 2009

Wiki banner 967px.png

Welcome to the DTU iGEM wiki!


Activities relating to our two sub-projects:

- The Redoxilator
- The USERTM assembly standard

Day-to-day activities


Activities relating to the redoxilator
July 20th

Construction of biobricks: The restriction products were evaluated on a 1% agarose gel (see figure 2).


DTUgel1.jpg

Figure 2: Restriction analysis of the three biobricks. July 19th

Construction of biobricks: The three plasmids were purified according to the protocol (link to protocol). Following the purification of the plasmids, a restriction analysis was performed using SpeI enzyme (10U) and incubated at 37ºC overnight.


July 18th

Construction of biobricks: Some colonies were picked from the transformation plates and made overnight cultures in liquid media.


July 17th

Construction of biobricks:


July 16th

Construction of biobricks:


July 15th

Construction of biobricks:


July 14th

Construction of biobricks:


July 13th

Construction of biobricks:


Work process

Our team works parallel in smaller sub-teams. Some of us work hard in the lab, while others are in the process of developing software and the in silico model of the Redoxilator system. However, we constantly keep each other updated, and meet often to exchange ideas and take turns at the different tasks, thus exhausting all of our combined knowledge in every aspect of this project.

Comments or questions to the team? Please -- Comments of questions to webmaster? Please