Virginia Commonwealth/10 July 2009

From 2009.igem.org

Revision as of 17:13, 17 July 2009 by Albergca (Talk | contribs)

Contents

Friday 10 July 2009

Results

Afton and Maria

  • Overnight culture was successful

Trentay 13:13, 10 July 2009 (UTC)

Craig and Clay

  • The overnight culture of the three parts related to limonene synthesis were unsuccessful. Possible reasons include bad parts, errors in electrotransformation procedure, and incorrect resistance.

Tasks

Afton and Maria

  • Make stocks of parts J23106 and J06702
  • Miniprep of parts J23106 and J06702
  • Digestion of parts J23106 and J06702
  • Electrophoresis test of parts J23106 and J06702
  • May Ligate parts with backbones pSB1C3 and pSB4C5 and store DNA
  • Write out complete plan for experimentation
    • Make plans to MaxiPrep
    • Write out a plan to organize ideas

Trentay 13:13, 10 July 2009 (UTC)

Craig and Clay

  • BBa_I742111, BBa_K118024, and BBa_K118025 need to be plated again.
  • If the new

Wetlab

Afton and Maria

  • Dilution of overnight culture
    • 2 mL of overnight culture was added to 4 mL of LB broth (6 mL)
      • 2 dilutions were done for each test tube
    • Cells not used in the MiniPrep will be stored in the -80 degree Celsius freezer
  • 500mL of 30 percent Glycerol stock was made
  • Cell stocks were made
    • 10 vials of J06702 were put in the -80 degree Celsius freezer
    • 5 vials of J23106 were put in the -80 degree Celsius freezer
  • MiniPrep was done on parts: J23106 and J6702
    • Amount of DNA was calculated with a Spectrophotometer
  • Digestion was performed on MiniPrepped parts
    • There are two digested J06702 PCR tubes
    • Digests will be frozen until Monday
      • Electrophoresis test will be held off until then
      • Ligation as well

Trentay 20:35, 10 July 2009 (UTC)