Team:UNICAMP-Brazil/Notebooks/August 15

From 2009.igem.org

Revision as of 05:57, 21 October 2009 by Raissa (Talk | contribs)

Topo l2.gif topo_r_igem.gif
topo_r_b.gif
Back to Calendar

YeastGuard

Biobrciks recovered: RBS and CFP digestion

  • Today we started the construction of our first biobrick. After quantificate the miniprep products (from 11/Aug) we performed the digestion (Protocol 14) with SpeI and PstI of plasmids containing the RBS and the CFP reporter in order to connect this parts.

  • After the digestion we isolated the target bands from the agarose gel, according to the Protocol 7.

20090815 Digestões-Lig 1.jpg
  • The CFP digested band was correctly purified from the gel, unfortunatly we lost the RBS fragment. =( It must have been lost at some stage of the purification, therefore we could not ligate this two parts today.

Raíssa