These are the major [http://www.upedu.org/upedu/process/itrwkfls/ms_lco.htm milestone objectives] for the inception phase:
- Vision TODO Move to Elaboration phase
- TODO Brainstorming, culminating in three concrete proposals.
- TODO Project Plan (sections Project Overview, Project Organization and Management Process)
- DONE Risk List, initial risk assessment
- TODO Iteration Plan, should be finished for Elaboration 1.
- DONE Glossary, some important terms defined.
- Use Cases, TODO Move to Elaboration phase and decide what to do with this.
- DONE Project Repository (mainly our Wiki), should be set up.
- Change Request, TODO Move to Elaboration phase (or decide not to use it)
- TODO More?
Inception 1 - NEW
TODO
Inception 2 - NEW
This is the iteration plan for the second Inception iteration, see the general Inception page for milestones.</noinclude>
Plan
End date: 2009-05-18
Overall objective: Choose idea we're going to work on. The most important requirements should be identified.
Tasks per role:
- Analyst
- Change Control Manager
- Role not used (yet).
- Configuration Manager
- Basic wiki finished.
- DONE Front page
- DONE Some categories
- ???
- TODO Survey possibilities wiki and mathworks
- ???
- Change Request
- Not used (yet).
- Project Repository
- DONE Rough structure for Wiki.
- DONE Guidelines for what should go on what medium (Wiki/Google Docs/Network drive).
- ?
- Basic wiki finished.
- Designer
- Facility Manager
- Implementer
- Integrator
- Modeller
- Project Manager
- Public Relations Officer
- Reviewer
- Scribe
- Stakeholder
- Tester
- Treasurer
Use Cases