Meetings September

From 2009.igem.org

Revision as of 20:30, 21 October 2009 by Divyail (Talk | contribs)

September was a very eventful and hectic month!! The constructs that were ordered from GeneArt arrived. That means we could start with making our final constructs and testing them. The silver stuff has not made any progress. We were not able to reproduce the paper and hence had to look for alternative protocols. We talked to eugene and got some interesting insight into the silver stuff.. so we will work on some new protocols.


Retrieved from "http://2009.igem.org/Meetings_September"