Team:Chiba/Project

From 2009.igem.org

(Difference between revisions)
Line 31: Line 31:
<table width="100%" border="1" cellpadding="1" cellspacing="0" align="center" bordercolor="#800000" align="center">
<table width="100%" border="1" cellpadding="1" cellspacing="0" align="center" bordercolor="#800000" align="center">
<tr><td>
<tr><td>
-
'''Parallel communication'''
+
'''Parallel Activation'''
</td></tr><tr><td>
</td></tr><tr><td>
*[[Team:Chiba/Project/Parallel|Overall]]
*[[Team:Chiba/Project/Parallel|Overall]]
-
</td></tr><tr><td>
 
-
*[[Team:Chiba/Project/LuxR Mutants|LuxR Mutants]]
 
</td></tr><tr><td>
</td></tr><tr><td>
*[[Team:Chiba/Modeling|Modeling]]
*[[Team:Chiba/Modeling|Modeling]]
</td></tr><tr><td>
</td></tr><tr><td>
-
*Testing
+
*[[Team:Chiba/Project/Parallel#Experiments|Experiments]]
</td></tr><tr><td>
</td></tr><tr><td>
-
*Results
+
*[[Team:Chiba/Project/Parallel#Results|Results]]
</td></tr></table>
</td></tr></table>
Line 47: Line 45:
<table width="100%" border="1" cellpadding="1" cellspacing="0" align="center" bordercolor="#800000" align="center">
<table width="100%" border="1" cellpadding="1" cellspacing="0" align="center" bordercolor="#800000" align="center">
<tr><td>
<tr><td>
-
'''Series communication'''
+
'''Series Activation'''
</td></tr><tr><td>
</td></tr><tr><td>
*[[Team:Chiba/Project/Series|Overall]]
*[[Team:Chiba/Project/Series|Overall]]
Line 55: Line 53:
*[[Team:Chiba/Modeling|Modeling]]
*[[Team:Chiba/Modeling|Modeling]]
</td></tr><tr><td>
</td></tr><tr><td>
-
*Testing
+
*[[Team:Chiba/Project/Series#Experiments|Experiments]]
</td></tr><tr><td>
</td></tr><tr><td>
-
*Results
+
*[[Team:Chiba/Project/Series#Results|Results]]
</td></tr></table>
</td></tr></table>
 +
|style="width:85%;" bgcolor="#FFFFFF"|
|style="width:85%;" bgcolor="#FFFFFF"|

Revision as of 07:10, 4 September 2009

Home

The Project

Introduction

Project Design

Conclusions


Constructing A Delay Switch

  • 去年の紹介


Parallel Activation


Series Activation



Contents

Introduction

Project Design

Signaling System

In this project, we use acylated homoserine lactones (AHLs), signaling molecules used for [http://en.wikipedia.org/wiki/Quorum_sensing quorum sensing] in gram negative bacteria. Senders express LuxI or similar enzymes, which catalyze the production of AHLs, under the control of a constitutive (Tet) promoter. Each cell thus generates AHL more or less at a constant rate. AHL can freely permeate cell membranes and are detected by neighboring cells. Receivers constitutively express LuxR proteins (or a similar ortholog), the protein that detects AHL concentrations. When AHLs bind LuxR proteins, the AHL-LuxR complex activates the Lux promoter. The threshold [AHL] at which switching occurs is determined by the affinity of AHL for the particulr LuxR ortholog. (more about quorum sensing)


Constructing A Delay Switch, Multiple Ways

2008のことを述べ、Mutantの実験をやってない(今年はやる)とせつめい。

In principle, there are three ways to delay the activation of chemical communications;

  1. Silencing the Speakers: Rate of signal accumulation down-regulated, for instance, by slowing down the signal generators.
  2. Desensitize Receivers: Switching threshold elevated, for instance, by using insensitive receiver/ reporter systems.
  3. Partial Blocking: Decreasing the by chewing the signal up.

Constructing A Flow of Activation

1, Parallel Communication

Team:Chiba/Project/Parallel


2, Series communication

Team:Chiba/Project/Series

Conclusions