Team:Kyoto/CiC/Notebook/1019-1023

From 2009.igem.org

(Difference between revisions)
(subgoal A --- Confirmation of function of TAT-liposome)
(subgoal A Confirmation of function of TAT-liposome)
Line 43: Line 43:
====Results====
====Results====
-
=====subgoal A Confirmation of function of TAT-liposome=====
+
=====subgoal A --- Confirmation of function of TAT-liposome=====
observation by microscope
observation by microscope

Revision as of 20:13, 21 October 2009

  1. Home
  2. CiC
  3. Notebook

0907-0911
constructing HIV-TAT-(LALAAAA)3-generator
0914-0918
constructing HIV-TAT-(LALAAAA)3-generator
0921-0925
constructing sig-GFP generator,sig-EGFP generator(HeLa)
0928-1002
constructing sig-GFP generator,sig-EGFP generator(HeLa)
1005-1009
constructing sig-GFP generator,sig-EGFP generator(HeLa)
1012-1016
Observation
1019-1023
Observation

1019-1025 :Obserbation


Monday, 19 October

To Do

  • subgoal A --- Confirmation of function of TAT-liposome
    • observation by microscope
  • Subgoal B --- Liposomes with Mitochondrial Translocases
    • Mitochondoria isolation
    • expressing sig-GFP in vitro with mitochondoria
  • Subgoal C --- sig-EGFP expression in HeLa
    • transfomation

Results

subgoal A --- Confirmation of function of TAT-liposome

observation by microscope

Subgoal B --- Liposomes with Mitochondrial Translocases

Mitochondoria isolation

    • expressing sig-GFP in vitro with mitochondoria
Subgoal C --- sig-EGFP expression in HeLa

sig-EGFP was made a localization in mitochondoria. See the results.



Tuesday, 20 October

To Do

Results



Wednesday, 21 October

To Do

Results