Team:UC Davis/Notebook
From 2009.igem.org
Line 46: | Line 46: | ||
<a | <a | ||
href="#september">September</a><br> | href="#september">September</a><br> | ||
+ | <img style="width: 665px; height: 322px;" alt="" | ||
+ | src="https://static.igem.org/mediawiki/2009/5/58/UCDAVIS_picture2.jpg"><br> | ||
</big></big></b> | </big></big></b> | ||
<hr style="width: 100%; height: 2px;"> | <hr style="width: 100%; height: 2px;"> | ||
- | |||
<p style="text-align: left;"><font face="Cambria" size="3"><big><big><span | <p style="text-align: left;"><font face="Cambria" size="3"><big><big><span | ||
style="font-weight: bold;"><a name="july"></a>July:</span></big></big><br> | style="font-weight: bold;"><a name="july"></a>July:</span></big></big><br> | ||
Line 85: | Line 86: | ||
August varies greatly on almost a daily basis.</font> <br> | August varies greatly on almost a daily basis.</font> <br> | ||
</div> | </div> | ||
- | |||
<div style="text-align: left;"><font face="Cambria" size="3"> | <div style="text-align: left;"><font face="Cambria" size="3"> | ||
Apart from the wet lab portion of our project, we | Apart from the wet lab portion of our project, we |
Revision as of 23:41, 1 October 2009
July August September
July:
Before beginning the wet lab
portion of our project, we have read numerous articles and journals
relevant to our proposed project, and have utilized this information to
guide our part designs. After significant research, design and
redesign, we have settled on the final design for our two key parts,
and plan for their construction.
We
have begun ordering the necessary reagents for our work. This
includes, selecting the parts required for our project from those
provided by the iGEM parts distribution, oligonucleotides for
extracting them, and for the synthesis of novel parts via Polymerase
Chain Reaction, PCR, and the DNA synthesis of several novel parts from
GENEART.
We have recently started the
synthesis and assembly of the initial elements required for the
secretion system.
After reading the numerous articles we dug up in regards to our project, we have designed our project; in blue print form of structural wet lab experimentation, as well as the techniques, materials, equipment, and time required to complete our project.
The parts and a majority of the reagents we have ordered necessary for our work have arrived, and we are in the stages of conducting experiments to construct our parts. We have to construct, test, and prove through sequencing as well as other miscellaneous techniques that we truly have the parts we want in our constructs. So the progress for the month of August varies greatly on almost a daily basis.