Team:Warsaw/Calendar-Main/6 September 2009

From 2009.igem.org

(Difference between revisions)
Line 25: Line 25:
'''Comments:'''
'''Comments:'''
* The enzym must have been deactivated due to presence of two forms of the plasmid. If circular plasmid is cut there are only one linear form in the sample. Althought in each case there was two forms - circular and supercoiled.
* The enzym must have been deactivated due to presence of two forms of the plasmid. If circular plasmid is cut there are only one linear form in the sample. Althought in each case there was two forms - circular and supercoiled.
 +
<html>
 +
<h3><div style="text-align: center;">Bistable switch 1 testing<h3>
 +
<h4>Ania</h4>
 +
<br/>
 +
<p>Tasks:</p>
 +
<ul>
 +
<li>
 +
</li>
 +
</ul>
 +
<br/>
 +
</html>

Revision as of 01:15, 10 September 2009


Previous day
return to main notebook page
Previous entry
next notebook entry

 


Assembly of endosomal detection operon

Marcin

Task:1

  • Transformation of chemocompetent E. coli TOP10 strain

Construct to transform:

Methods:

  • Detailed protocol of transformation is described here

Task 2:

  • Digest isolated plasmid with Bax CDS to verify the correctness of the ligation:

Methods:

  • Reaction mixture composition:
2 μl purified plasmid DNA product
1 μl RsaI (NEB)
2 μl Buffer Tango (Fermentas)
15 μl MQ water
  • Digest was performed 3 hours

Results:

Comments:

  • The enzym must have been deactivated due to presence of two forms of the plasmid. If circular plasmid is cut there are only one linear form in the sample. Althought in each case there was two forms - circular and supercoiled.

Bistable switch 1 testing

Ania


Tasks:





April
MTWTFSS
    1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30
May
MTWTFSS
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
June
MTWTFSS
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30
July
MTWTFSS
    1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
August
MTWTFSS
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31
September
MTWTFSS
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30
October
MTWTFSS
      1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31