Plan
End date: 2009-06-01
Overall objective: The initial design should be made, the requirements refined. Some initial model prototypes should be made to gain experience in modelling.
Tasks per role:
- Analyst
- Objective: Project requirements, feasibility and detailed project vision should be finished.
- Tasks:
- Change Control Manager
- Role not used (yet).
- Configuration Manager
- TODO Configuration Management Plan mostly done.
- Designer
- Tasks:
- Which bacterial strains, vectors and genes are needed.
- Are there multiple BioBricks which can be used in case that one does not work.
- Tasks:
- Facility Manager
- TODO Configuration Management Plan, at least the section "Tools, Environment, and Infrastructure" and "Configuration Identification" where applicable (and anything else needed to establish some basic procedures/conventions for our lab work).
- Implementer
- Objective: Have started with preparation labwork.
- Tasks:
- What equipment is needed, communicate this with the facility manager.
- Order BioBrick restiction enzymes / ligases (fast-digest, Fermentas).
- Which chemicals / media are needed and can we use them from the MolGen department. Start ordering chemicals/media.
- Work out a cloning strategy, to check feasibility.
- Try to make a plan with project parts which can be done simultaneously.
- Integrator
- Modeller
- Project Manager
- Public Relations Officer
- Objective: Get in contact with other teams and media
- Tasks:
- Get in contact with iGEM teams from Delft and Amsterdam, and organize a meeting at the end of June for trouble solving and getting to know eachother (Getting There)
- Get in contact with the different "studie verenigingen" of the teammembers for publication of a short story about iGEM and the team (TODO)
- Reviewer
- Scribe
- Stakeholder
- Tester
- Treasurer
- Tasks:
- Try to find protocols for the characterization, to check feasibility. ???
- Tasks:
Use Cases
[List the use cases and scenarios that are being developed for this iteration.]
Evaluation Criteria
[Functionality, performance, capacity, quality measures, quality goals, and so forth.]