Team:Imperial College London/Wetlab/Calendar

From 2009.igem.org

(Difference between revisions)
(New page: {{Imperial/09/TemplateTop}} ==[[|22/09/09]]==)
Line 1: Line 1:
{{Imperial/09/TemplateTop}}
{{Imperial/09/TemplateTop}}
==[[Team:22/09/09|22/09/09]]==
==[[Team:22/09/09|22/09/09]]==
 +
Dave – PCR the SLIC primers for the RCSB parts (ultimately to SLIC construct 13): PcstA + RBS by PCR out from construct 1
 +
Dineka – Midi + taking out stuff from the registry for all controls (5 experiments) + Mini (J5526 + CRP-GFP + CRP-RBS)
 +
Kun + Charles – Plate OD calibration by today + HVD-GFP (preliminary set of results but without proper controls) + Autoinduction media testing
 +
{{Imperial/09/TemplateBottom}}

Revision as of 09:18, 22 September 2009

22/09/09

Dave – PCR the SLIC primers for the RCSB parts (ultimately to SLIC construct 13): PcstA + RBS by PCR out from construct 1 Dineka – Midi + taking out stuff from the registry for all controls (5 experiments) + Mini (J5526 + CRP-GFP + CRP-RBS) Kun + Charles – Plate OD calibration by today + HVD-GFP (preliminary set of results but without proper controls) + Autoinduction media testing

Mr. Gene   Geneart   Clontech   Giant Microbes