Team:NCTU Formosa/Notebook/Calendar

From 2009.igem.org

(Difference between revisions)
Line 428: Line 428:
<div class="date"><p><a name="0824" id="8/24"></a> 8/24 </p></div>
<div class="date"><p><a name="0824" id="8/24"></a> 8/24 </p></div>
<div class="events"><p>we check DNA by agarose gel, SDS-PAGE.</p></div>
<div class="events"><p>we check DNA by agarose gel, SDS-PAGE.</p></div>
-
<div class="date"><p><a name="0828" id="8/28"></a> 8/24 </p></div>
+
<div class="date">
 +
  <p><a name="0828" id="8/28"></a> 8/26 </p>
 +
</div>
<div class="events"><p>we design a logo of team NCTU_FORMOSA</p></div>
<div class="events"><p>we design a logo of team NCTU_FORMOSA</p></div>
</div>
</div>
Line 440: Line 442:
<div class="innertext">   
<div class="innertext">   
<div class="date"><p><a name="0901" id="9/1"></a> 9/1 </p></div>
<div class="date"><p><a name="0901" id="9/1"></a> 9/1 </p></div>
-
<div class="events"><p>the experiment is not so smoothly, we sink into infinite loop in the same experiments.</p></div>
+
<div class="events"><p>The experiment is not so smoothly, we sink into infinite loop in the same experiments.</p></div>
 +
<div class="date"><p><a name="0902" id="9/2"></a> 9/2 </p></div>
 +
<div class="events"><p>To digest the front part (8/23) and the behind part (8/26) of the biobrick, ligate, transform and run gel to check that if digestion is OK or not, then spread on the plate, and incubate for 20hr.</p></div>
 +
<div class="date"><p><a name="0907" id="9/7"></a> 9/7 </p></div>
 +
<div class="events"><p>We use another enzyme to digest to double check if the plasmid is right or not</p></div>
<div class="date"><p><a name="0910" id="9/10"></a> 9/10 </p></div>
<div class="date"><p><a name="0910" id="9/10"></a> 9/10 </p></div>
<div class="events"><p>Today we have a meeting that we discuss how to solve the problems.</p></div>
<div class="events"><p>Today we have a meeting that we discuss how to solve the problems.</p></div>
Line 456: Line 462:
<div class="month"><p><a name="oct" id="oct"></a> <h2> October </h2></p></div>
<div class="month"><p><a name="oct" id="oct"></a> <h2> October </h2></p></div>
<div class="innertext">
<div class="innertext">
 +
            <div class="date"><p><a name="1002" id="10/2"></a> 10/2 </p></div>
 +
<div class="events"><p>Degenerated PCR. Restriction enzyme map.</p></div>
 +
            <div class="date"><p><a name="1007" id="10/7"></a> 10/7 </p></div>
 +
<div class="events"><p>Gel purification. To ligate gel purification products</p></div>
             <div class="date"><p><a name="1012" id="10/12"></a> 10/12 </p></div>
             <div class="date"><p><a name="1012" id="10/12"></a> 10/12 </p></div>
-
<div class="events"><p> We had a team work to work on the wiki web.  </p></div>  
+
<div class="events"><p> We had a team work to work on the wiki web. Flow cytometer.  </p></div>  
             <div class="date"><p><a name="1014" id="10/14"></a> 10/14 </p></div>
             <div class="date"><p><a name="1014" id="10/14"></a> 10/14 </p></div>
-
<div class="events"><p> Submitted the parts. </p></div>  
+
<div class="events"><p> Submitted the parts to be sequenced.</p></div>  
             <div class="date"><p><a name="1018" id="10/18"></a> 10/18 </p></div>
             <div class="date"><p><a name="1018" id="10/18"></a> 10/18 </p></div>
<div class="events"><p> Updated the web of notebook and the project. &nbsp; We also had a group discussion about our results and the data.</p></div>
<div class="events"><p> Updated the web of notebook and the project. &nbsp; We also had a group discussion about our results and the data.</p></div>

Revision as of 18:04, 21 October 2009

July

7/15

It is the beginning today!!!!!!!!

7/17

Lesson:Parts, Devices and Biobricks.  In this lesson we learned about the principle of the construction of biobricks.

August

8/03

A group duscussion of each one's personal idea.

8/07

A group discussion.   We decided what kind of projects we're going to construct.

8/12

A group discussion.  We discussed about the principle and some details of the project. We also designed the first step of the experimence and the protocols.

8/17

Today we devided our team into 5 subgroups and started the experimence.   In each subgroup, we have to contribute a part of the whole project.

8/18

We transformed the bricks we need from the well.

8/24

we check DNA by agarose gel, SDS-PAGE.

8/26

we design a logo of team NCTU_FORMOSA

September

9/1

The experiment is not so smoothly, we sink into infinite loop in the same experiments.

9/2

To digest the front part (8/23) and the behind part (8/26) of the biobrick, ligate, transform and run gel to check that if digestion is OK or not, then spread on the plate, and incubate for 20hr.

9/7

We use another enzyme to digest to double check if the plasmid is right or not

9/10

Today we have a meeting that we discuss how to solve the problems.

9/16

BBa_K188343 is sequenced today.

9/28

Degenerated PCR, using BBa_K145279 as template

October

10/2

Degenerated PCR. Restriction enzyme map.

10/7

Gel purification. To ligate gel purification products

10/12

We had a team work to work on the wiki web. Flow cytometer.

10/14

Submitted the parts to be sequenced.

10/18

Updated the web of notebook and the project.   We also had a group discussion about our results and the data.

10/21

To discuss our final result.