Team:Calgary/17 June 2009

From 2009.igem.org

(Difference between revisions)
Line 299: Line 299:
</html>
</html>
-
<center>[[Image:https://2009.igem.org/Image:Calgary_luxOU_ColPCR.jpg  | 500px]]</center>
+
<center>[[Image:Calgary_luxOU_ColPCR.jpg  | 500px]]</center>
Figure. 1% agarose gel (100V) for colony PCR of TOP10 transformants using pTaq.  Six colonies from each construction techniques were screened.  Lane 2-7 are transformants from the EcoRI and PstI construction. Lane 8-13 are transformants from the XbaI and PstI construction. Lane 14 is the negative control.  Expected band size was 2kb.  Gene specific primers were used.  5μL of GeneRuler 1kb Plus DNA Ladder was loaded.   
Figure. 1% agarose gel (100V) for colony PCR of TOP10 transformants using pTaq.  Six colonies from each construction techniques were screened.  Lane 2-7 are transformants from the EcoRI and PstI construction. Lane 8-13 are transformants from the XbaI and PstI construction. Lane 14 is the negative control.  Expected band size was 2kb.  Gene specific primers were used.  5μL of GeneRuler 1kb Plus DNA Ladder was loaded.   
Plasmid isolation of overnight cultures using QIAgen miniprep kit. Elution in 50uL ddH2O.
Plasmid isolation of overnight cultures using QIAgen miniprep kit. Elution in 50uL ddH2O.
 +
 +
Overnight digest set up of 2 plasmids from each construction technique with ''Not''I (Invitrogen, CA) at 37oC.
<html>
<html>

Revision as of 21:58, 10 September 2009

University of Calgary

UNIVERSITY OF CALGARY



THIS MONTH

June
MTWTFSS
[http://2009.igem.org/Team:Calgary/1_June_2009 1] [http://2009.igem.org/Team:Calgary/2_June_2009 2] [http://2009.igem.org/Team:Calgary/3_June_2009 3] [http://2009.igem.org/Team:Calgary/4_June_2009 4] [http://2009.igem.org/Team:Calgary/5_June_2009 5] [http://2009.igem.org/Team:Calgary/6_June_2009 6] [http://2009.igem.org/Team:Calgary/7_June_2009 7]
[http://2009.igem.org/Team:Calgary/8_June_2009 8] [http://2009.igem.org/Team:Calgary/9_June_2009 9] [http://2009.igem.org/Team:Calgary/10_June_2009 10] [http://2009.igem.org/Team:Calgary/11_June_2009 11] [http://2009.igem.org/Team:Calgary/12_June_2009 12] [http://2009.igem.org/Team:Calgary/13_June_2009 13] [http://2009.igem.org/Team:Calgary/14_June_2009 14]
[http://2009.igem.org/Team:Calgary/15_June_2009 15] [http://2009.igem.org/Team:Calgary/16_June_2009 16] [http://2009.igem.org/Team:Calgary/17_June_2009 17] [http://2009.igem.org/Team:Calgary/18_June_2009 18] [http://2009.igem.org/Team:Calgary/19_June_2009 19] [http://2009.igem.org/Team:Calgary/20_June_2009 20] [http://2009.igem.org/Team:Calgary/21_June_2009 21]
[http://2009.igem.org/Team:Calgary/22_June_2009 22] [http://2009.igem.org/Team:Calgary/23_June_2009 23] [http://2009.igem.org/Team:Calgary/24_June_2009 24] [http://2009.igem.org/Team:Calgary/25_June_2009 25] [http://2009.igem.org/Team:Calgary/26_June_2009 26] [http://2009.igem.org/Team:Calgary/27_June_2009 27] [http://2009.igem.org/Team:Calgary/28_June_2009 28]
[http://2009.igem.org/Team:Calgary/29_June_2009 29] [http://2009.igem.org/Team:Calgary/30_June_2009 30]


NOTEBOOK PAGE INDEX



CALENDAR

May
MTWTFSS
        [http://2009.igem.org/Team:Calgary/1_May_2009 1] [http://2009.igem.org/Team:Calgary/2_May_2009 2] [http://2009.igem.org/Team:Calgary/3_May_2009 3]
[http://2009.igem.org/Team:Calgary/4_May_2009 4] [http://2009.igem.org/Team:Calgary/5_May_2009 5] [http://2009.igem.org/Team:Calgary/6_May_2009 6] [http://2009.igem.org/Team:Calgary/7_May_2009 7] [http://2009.igem.org/Team:Calgary/8_May_2009 8] [http://2009.igem.org/Team:Calgary/9_May_2009 9] [http://2009.igem.org/Team:Calgary/10_May_2009 10]
[http://2009.igem.org/Team:Calgary/11_May_2009 11] [http://2009.igem.org/Team:Calgary/12_May_2009 12] [http://2009.igem.org/Team:Calgary/13_May_2009 13] [http://2009.igem.org/Team:Calgary/14_May_2009 14] [http://2009.igem.org/Team:Calgary/15_May_2009 15] [http://2009.igem.org/Team:Calgary/16_May_2009 16] [http://2009.igem.org/Team:Calgary/17_May_2009 17]
[http://2009.igem.org/Team:Calgary/18_May_2009 18] [http://2009.igem.org/Team:Calgary/19_May_2009 19] [http://2009.igem.org/Team:Calgary/20_May_2009 20] [http://2009.igem.org/Team:Calgary/21_May_2009 21] [http://2009.igem.org/Team:Calgary/22_May_2009 22] [http://2009.igem.org/Team:Calgary/23_May_2009 23] [http://2009.igem.org/Team:Calgary/24_May_2009 24]
[http://2009.igem.org/Team:Calgary/25_May_2009 25] [http://2009.igem.org/Team:Calgary/26_May_2009 26] [http://2009.igem.org/Team:Calgary/27_May_2009 27] [http://2009.igem.org/Team:Calgary/28_May_2009 28] [http://2009.igem.org/Team:Calgary/29_May_2009 29] [http://2009.igem.org/Team:Calgary/30_May_2009 30] [http://2009.igem.org/Team:Calgary/31_May_2009 31]


June
MTWTFSS
[http://2009.igem.org/Team:Calgary/1_June_2009 1] [http://2009.igem.org/Team:Calgary/2_June_2009 2] [http://2009.igem.org/Team:Calgary/3_June_2009 3] [http://2009.igem.org/Team:Calgary/4_June_2009 4] [http://2009.igem.org/Team:Calgary/5_June_2009 5] [http://2009.igem.org/Team:Calgary/6_June_2009 6] [http://2009.igem.org/Team:Calgary/7_June_2009 7]
[http://2009.igem.org/Team:Calgary/8_June_2009 8] [http://2009.igem.org/Team:Calgary/9_June_2009 9] [http://2009.igem.org/Team:Calgary/10_June_2009 10] [http://2009.igem.org/Team:Calgary/11_June_2009 11] [http://2009.igem.org/Team:Calgary/12_June_2009 12] [http://2009.igem.org/Team:Calgary/13_June_2009 13] [http://2009.igem.org/Team:Calgary/14_June_2009 14]
[http://2009.igem.org/Team:Calgary/15_June_2009 15] [http://2009.igem.org/Team:Calgary/16_June_2009 16] [http://2009.igem.org/Team:Calgary/17_June_2009 17] [http://2009.igem.org/Team:Calgary/18_June_2009 18] [http://2009.igem.org/Team:Calgary/19_June_2009 19] [http://2009.igem.org/Team:Calgary/20_June_2009 20] [http://2009.igem.org/Team:Calgary/21_June_2009 21]
[http://2009.igem.org/Team:Calgary/22_June_2009 22] [http://2009.igem.org/Team:Calgary/23_June_2009 23] [http://2009.igem.org/Team:Calgary/24_June_2009 24] [http://2009.igem.org/Team:Calgary/25_June_2009 25] [http://2009.igem.org/Team:Calgary/26_June_2009 26] [http://2009.igem.org/Team:Calgary/27_June_2009 27] [http://2009.igem.org/Team:Calgary/28_June_2009 28]
[http://2009.igem.org/Team:Calgary/29_June_2009 29] [http://2009.igem.org/Team:Calgary/30_June_2009 30]


July
MTWTFSS
    [http://2009.igem.org/Team:Calgary/1_July_2009 1] [http://2009.igem.org/Team:Calgary/2_July_2009 2] [http://2009.igem.org/Team:Calgary/3_July_2009 3] [http://2009.igem.org/Team:Calgary/4_July_2009 4] [http://2009.igem.org/Team:Calgary/5_July_2009 5]
[http://2009.igem.org/Team:Calgary/6_July_2009 6] [http://2009.igem.org/Team:Calgary/7_July_2009 7] [http://2009.igem.org/Team:Calgary/8_July_2009 8] [http://2009.igem.org/Team:Calgary/9_July_2009 9] [http://2009.igem.org/Team:Calgary/10_July_2009 10] [http://2009.igem.org/Team:Calgary/11_July_2009 11] [http://2009.igem.org/Team:Calgary/12_July_2009 12]
[http://2009.igem.org/Team:Calgary/13_July_2009 13] [http://2009.igem.org/Team:Calgary/14_July_2009 14] [http://2009.igem.org/Team:Calgary/15_July_2009 15] [http://2009.igem.org/Team:Calgary/16_July_2009 16] [http://2009.igem.org/Team:Calgary/17_July_2009 17] [http://2009.igem.org/Team:Calgary/18_July_2009 18] [http://2009.igem.org/Team:Calgary/19_July_2009 19]
[http://2009.igem.org/Team:Calgary/20_July_2009 20] [http://2009.igem.org/Team:Calgary/21_July_2009 21] [http://2009.igem.org/Team:Calgary/22_July_2009 22] [http://2009.igem.org/Team:Calgary/23_July_2009 23] [http://2009.igem.org/Team:Calgary/24_July_2009 24] [http://2009.igem.org/Team:Calgary/25_July_2009 25] [http://2009.igem.org/Team:Calgary/26_July_2009 26]
[http://2009.igem.org/Team:Calgary/27_July_2009 27] [http://2009.igem.org/Team:Calgary/28_July_2009 28] [http://2009.igem.org/Team:Calgary/29_July_2009 29] [http://2009.igem.org/Team:Calgary/30_July_2009 30] [http://2009.igem.org/Team:Calgary/31_July_2009 31]


August
MTWTFSS
          [http://2009.igem.org/Team:Calgary/1_August_2009 1] [http://2009.igem.org/Team:Calgary/2_August_2009 2]
[http://2009.igem.org/Team:Calgary/3_August_2009 3] [http://2009.igem.org/Team:Calgary/4_August_2009 4] [http://2009.igem.org/Team:Calgary/5_August_2009 5] [http://2009.igem.org/Team:Calgary/6_August_2009 6] [http://2009.igem.org/Team:Calgary/7_August_2009 7] [http://2009.igem.org/Team:Calgary/8_August_2009 8] [http://2009.igem.org/Team:Calgary/9_August_2009 9]
[http://2009.igem.org/Team:Calgary/10_August_2009 10] [http://2009.igem.org/Team:Calgary/11_August_2009 11] [http://2009.igem.org/Team:Calgary/12_August_2009 12] [http://2009.igem.org/Team:Calgary/13_August_2009 13] [http://2009.igem.org/Team:Calgary/14_August_2009 14] [http://2009.igem.org/Team:Calgary/15_August_2009 15] [http://2009.igem.org/Team:Calgary/16_August_2009 16]
[http://2009.igem.org/Team:Calgary/17_August_2009 17] [http://2009.igem.org/Team:Calgary/18_August_2009 18] [http://2009.igem.org/Team:Calgary/19_August_2009 19] [http://2009.igem.org/Team:Calgary/20_August_2009 20] [http://2009.igem.org/Team:Calgary/21_August_2009 21] [http://2009.igem.org/Team:Calgary/22_August_2009 22] [http://2009.igem.org/Team:Calgary/23_August_2009 23]
[http://2009.igem.org/Team:Calgary/24_August_2009 24] [http://2009.igem.org/Team:Calgary/25_August_2009 25] [http://2009.igem.org/Team:Calgary/26_August_2009 26] [http://2009.igem.org/Team:Calgary/27_August_2009 27] [http://2009.igem.org/Team:Calgary/28_August_2009 28] [http://2009.igem.org/Team:Calgary/29_August_2009 29] [http://2009.igem.org/Team:Calgary/30_August_2009 30]
[http://2009.igem.org/Team:Calgary/31_August_2009 31]


September
MTWTFSS
  [http://2009.igem.org/Team:Calgary/1_September_2009 1] [http://2009.igem.org/Team:Calgary/2_September_2009 2] [http://2009.igem.org/Team:Calgary/3_September_2009 3] [http://2009.igem.org/Team:Calgary/4_September_2009 4] [http://2009.igem.org/Team:Calgary/5_September_2009 5] [http://2009.igem.org/Team:Calgary/6_September_2009 6]
[http://2009.igem.org/Team:Calgary/7_September_2009 7] [http://2009.igem.org/Team:Calgary/8_September_2009 8] [http://2009.igem.org/Team:Calgary/9_September_2009 9] [http://2009.igem.org/Team:Calgary/10_September_2009 10] [http://2009.igem.org/Team:Calgary/11_September_2009 11] [http://2009.igem.org/Team:Calgary/12_September_2009 12] [http://2009.igem.org/Team:Calgary/13_September_2009 13]
[http://2009.igem.org/Team:Calgary/14_September_2009 14] [http://2009.igem.org/Team:Calgary/15_September_2009 15] [http://2009.igem.org/Team:Calgary/16_September_2009 16] [http://2009.igem.org/Team:Calgary/17_September_2009 17] [http://2009.igem.org/Team:Calgary/18_September_2009 18] [http://2009.igem.org/Team:Calgary/19_September_2009 19] [http://2009.igem.org/Team:Calgary/20_September_2009 20]
[http://2009.igem.org/Team:Calgary/21_September_2009 21] [http://2009.igem.org/Team:Calgary/22_September_2009 22] [http://2009.igem.org/Team:Calgary/23_September_2009 23] [http://2009.igem.org/Team:Calgary/24_September_2009 24] [http://2009.igem.org/Team:Calgary/25_September_2009 25] [http://2009.igem.org/Team:Calgary/26_September_2009 26] [http://2009.igem.org/Team:Calgary/27_September_2009 27]
[http://2009.igem.org/Team:Calgary/28_September_2009 28] [http://2009.igem.org/Team:Calgary/29_September_2009 29] [http://2009.igem.org/Team:Calgary/30_September_2009 30]


October
MTWTFSS
      [http://2009.igem.org/Team:Calgary/1_October_2009 1] [http://2009.igem.org/Team:Calgary/2_October_2009 2] [http://2009.igem.org/Team:Calgary/3_October_2009 3] [http://2009.igem.org/Team:Calgary/4_October_2009 4]
[http://2009.igem.org/Team:Calgary/5_October_2009 5] [http://2009.igem.org/Team:Calgary/6_October_2009 6] [http://2009.igem.org/Team:Calgary/7_October_2009 7] [http://2009.igem.org/Team:Calgary/8_October_2009 8] [http://2009.igem.org/Team:Calgary/9_October_2009 9] [http://2009.igem.org/Team:Calgary/10_October_2009 10] [http://2009.igem.org/Team:Calgary/11_October_2009 11]
[http://2009.igem.org/Team:Calgary/12_October_2009 12] [http://2009.igem.org/Team:Calgary/13_October_2009 13] [http://2009.igem.org/Team:Calgary/14_October_2009 14] [http://2009.igem.org/Team:Calgary/15_October_2009 15] [http://2009.igem.org/Team:Calgary/16_October_2009 16] [http://2009.igem.org/Team:Calgary/17_October_2009 17] [http://2009.igem.org/Team:Calgary/18_October_2009 18]
[http://2009.igem.org/wiki/index.php?title=Team:Calgary/19_October_2009&preload=Team:Calgary/NotebookPreload&action=edit 19] [http://2009.igem.org/wiki/index.php?title=Team:Calgary/20_October_2009&preload=Team:Calgary/NotebookPreload&action=edit 20] [http://2009.igem.org/wiki/index.php?title=Team:Calgary/21_October_2009&preload=Team:Calgary/NotebookPreload&action=edit 21] [http://2009.igem.org/wiki/index.php?title=Team:Calgary/22_October_2009&preload=Team:Calgary/NotebookPreload&action=edit 22] [http://2009.igem.org/wiki/index.php?title=Team:Calgary/23_October_2009&preload=Team:Calgary/NotebookPreload&action=edit 23] [http://2009.igem.org/wiki/index.php?title=Team:Calgary/24_October_2009&preload=Team:Calgary/NotebookPreload&action=edit 24] [http://2009.igem.org/wiki/index.php?title=Team:Calgary/25_October_2009&preload=Team:Calgary/NotebookPreload&action=edit 25]
[http://2009.igem.org/wiki/index.php?title=Team:Calgary/26_October_2009&preload=Team:Calgary/NotebookPreload&action=edit 26] [http://2009.igem.org/wiki/index.php?title=Team:Calgary/27_October_2009&preload=Team:Calgary/NotebookPreload&action=edit 27] [http://2009.igem.org/wiki/index.php?title=Team:Calgary/28_October_2009&preload=Team:Calgary/NotebookPreload&action=edit 28] [http://2009.igem.org/wiki/index.php?title=Team:Calgary/29_October_2009&preload=Team:Calgary/NotebookPreload&action=edit 29] [http://2009.igem.org/wiki/index.php?title=Team:Calgary/30_October_2009&preload=Team:Calgary/NotebookPreload&action=edit 30] [http://2009.igem.org/wiki/index.php?title=Team:Calgary/31_October_2009&preload=Team:Calgary/NotebookPreload&action=edit 31]



JUNE 17, 2009


CAROL
QuikChange XL Site-Directed Mutagenesis for ''luxCDABE''in TOPO vector

Purpose: To mutate the XbaI site that is located about ~1000bp into the sequence. The reason for mutating the XbaI site for luxCDABE in TOPO vector is because to clone the sequence into a biobrick vector (pSB1AK3 and pSB1AC3), the enzyme, 'XbaI' is required for cloning purposes. Instead of cutting the sequence into two parts, we have to mutate the site so that it only cuts at the end of the sequence properly.

  • QuikChange XL Site-Directed Mutagenesis Kit retrived from Stratagene
  • Both the control reaction and the control transformation was done as well to ensure efficiency of mutagenesis. Please see detailed procedures for mutagenesis in the protocol section.
  • Plamids were transformed into XL Gold Ultracompetent cells (part of the kit) and was plated on LB plates overnight at 37oC. The XL Gold Ultracompetent cells allow the uptake of single stranded DNA.


CHINMOYEE

Research : What is Hill Function ?

Hill function was first used to describe the binding between hemoglobin and oxygen . The Hill function describe the binding affinities between enzymes and substrates.


EMILY

Transformation of BBK LuxOD47E in psB1AC3

  • Performed Antarctic Phosphotase treatment (NEB) on psB1AC3 vector from yesterday's construction digest according to the manufacturer's directions. Ligated with QuikLigase(Invitrogen).
  • Transformed into TOP10 CaCl2 competant cells, along with PBluescript as a positive control for our competant cells, and plated on C plates for LuxOD47E and on A plates for PBluescript. Left plates in the 37 C incubator ovenright for growth.


FAHD

Marketing for June 17th 2009

Today i worked on our iGEM newsletter and wrote up stories for the events that we will be inserting in the newsletter. Events that are to be included wil be our bake sales and our progress in the lab, matlab and second life so far.

I also called some research and biotechnology companies for sponsorship and will do a follow-up with them soon.


IMAN

Descriptive Title of What You're Doing

WIKI CODING HERE


JAMIE

Visualization of colony PCR products and plasmid isolation

Calgary luxOU ColPCR.jpg

Figure. 1% agarose gel (100V) for colony PCR of TOP10 transformants using pTaq. Six colonies from each construction techniques were screened. Lane 2-7 are transformants from the EcoRI and PstI construction. Lane 8-13 are transformants from the XbaI and PstI construction. Lane 14 is the negative control. Expected band size was 2kb. Gene specific primers were used. 5μL of GeneRuler 1kb Plus DNA Ladder was loaded.

Plasmid isolation of overnight cultures using QIAgen miniprep kit. Elution in 50uL ddH2O.

Overnight digest set up of 2 plasmids from each construction technique with NotI (Invitrogen, CA) at 37oC.


JEREMY

Gel of Colony PCR of LuxPQ in psB1AK3

The purpose today was to visualize the colony PCR of LuxPQ in psB1AK3. A 0.8% agarose gel was made to run the LuxPQ in psB1AK3 PCR products. Lanes 3-6 revealed faint bands at ~4,0 kb (the desired size), and the other wells (including the negative control) were clean.


KATIE

Plan for restriction digest

  • I believe the only cuts I am going to focus on are the digests that will allow for a part of a circuit to be inserted behind or in front of another part.
  • I will also have to start organizing a restriction digest notecard that explains the different restriction sites for a biobrick as well as the types of restriction enzymes. I will also most likely walk through one of the way to cut a part so that it is inserted in front of something and then leave the other way up to them
  • For the quorum sensing display, I spent time placing the movement script into the bacteria and allowing for controlled replication


KEVIN

Bacterial transformation

The parts R0040, B0015, and J13002 were taken out from the 2009 DNA distribution kit, and were transformed into TOP10 cells. These parts are needed for general construction of our circuits.
500px‎

MANDY

Descriptive Title of What You're Doing

WIKI CODING HERE


PATRICK

Descriptive Title of What You're Doing

WIKI CODING HERE


PRIMA

Marketing and Newsletter

I began to write up stories on events and conferences from last month to add to our June newsletter. I also helped to pick our sponsor of the month. This month's proud sponsor of the month is BioAlberta! Congratulations!

I also followed up on 8 different companies, 2 of which are considering our project. I'm having difficulties trying to get a hold of some of these staff. I've left voice mails and sent emails with our sponsorship package. I'll continue to follow up throughout the week.


STEFAN

Descriptive Title of What You're Doing

WIKI CODING HERE


VICKI

Plasmid isolation of LuxOD47A BBk from the overnight cultures made last night

Purpose: we have lots of competent TOP 10 cells with transformed LuxOD47A BBk on psB1AC3 in overnight plates, restreaks and cultures. The DNA in the overnight culture will be manipulated, but first it needs to be removed from the cells.

Protocol: Plasmid isolation was conducted in accordance with the procedure outlined on the protocol page for Sigma mini-prep kits. The concentrations of the isolated plasmids in ddHOH were measured with the Nanodrop spectrophotometer and placed in the -20 degree C freezer for a NotI restriction digest tomorrow.


Negative control test

Purpose: Contamination appears to be rampant in everyone’s PCR products. This will test our reagents used in PCR master mix and help determine where the contamination is coming from.

Protocol: 3 samples were made: the negative control PCR product from yesterday (already amplified); new master mix with old water; and new master mix with new water. A PCR with pTaq DNA polymerase was conducted in accordance with the procedure outlined on the protocol page.

Results: These are shown below. All of the purportedly negative controls are contaminated, including the new master mix made with new ddHOH. This implies that the communal reagents used in the master mix are also contaminated with a sequence that is specific to LuxO primers.



June17.png