Team:NTU-Singapore/Project/Wetlab

From 2009.igem.org

Revision as of 17:33, 21 October 2009 by Iandravid (Talk | contribs)

Conclusive Results


Successful Constructs

The following are the constructs that we have shown to be working.

  1. J23119-RBS-NorR-Term (system construct)
  2. J23119-RBS-GFP-Term (characterization construct)
  3. pLacI-RBS-CHE-Term (test construct)
  4. J23199-RBS-HO1-Term-J23119-RBS-IFP1.4-Term (test construct)

The first construct



NTU@iGEMcc 2009. Some rights reserved.