Team:Newcastle/Timetable
From 2009.igem.org
(Difference between revisions)
TubularWorld (Talk | contribs) |
TubularWorld (Talk | contribs) |
||
Line 107: | Line 107: | ||
| | | | ||
|- | |- | ||
- | | 12/03/2009 – | + | | 12/03/2009 – 01/08/2009 |
| Design of modelling related sub-projects/tasks | | Design of modelling related sub-projects/tasks | ||
| Goksel | | Goksel | ||
Line 131: | Line 131: | ||
| | | | ||
|- | |- | ||
- | | 26/03/2009 - 10/ | + | | 26/03/2009 - 10/10/2009 |
| Implementation of modelling related sub-projects/tasks | | Implementation of modelling related sub-projects/tasks | ||
- | | | + | | James, Goksel and Hanny |
| Ongoing | | Ongoing | ||
| √ | | √ | ||
|- | |- | ||
- | | 26/03/2009 – | + | | 26/03/2009 – 03/08/2009 |
| Find Sponsors | | Find Sponsors | ||
| Mat/Arun | | Mat/Arun | ||
Line 155: | Line 155: | ||
| | | | ||
|- | |- | ||
- | | | + | | 11/10/2009 |
| Review of modelling tasks | | Review of modelling tasks | ||
| Hanny | | Hanny | ||
Line 180: | Line 180: | ||
| √ | | √ | ||
|- | |- | ||
- | | 01/07/2009 – | + | | 01/07/2009 – 21/10/2009 |
| Outline and detail a new approach to an issue of Human Practice in synthetic biology as it relates to your project, such as safety, security, ethics, or ownership, sharing, and innovation. <SPAN style="COLOR: #9900ff">[GOLD 1]</SPAN> | | Outline and detail a new approach to an issue of Human Practice in synthetic biology as it relates to your project, such as safety, security, ethics, or ownership, sharing, and innovation. <SPAN style="COLOR: #9900ff">[GOLD 1]</SPAN> | ||
| all | | all | ||
Line 189: | Line 189: | ||
| Help another iGEM team by, for example, charactering a part, debugging a construct, or modeling or simulating their system <SPAN style="COLOR: #9900ff">[GOLD 2]</SPAN> | | Help another iGEM team by, for example, charactering a part, debugging a construct, or modeling or simulating their system <SPAN style="COLOR: #9900ff">[GOLD 2]</SPAN> | ||
| all | | all | ||
- | | | + | | Done |
| | | | ||
|- | |- | ||
Line 222: | Line 222: | ||
| | | | ||
|- | |- | ||
- | | <SPAN style="BACKGROUND: #ff9900"> | + | | <SPAN style="BACKGROUND: #ff9900">20/07/2009</SPAN> |
| Book the flights and hotel rooms | | Book the flights and hotel rooms | ||
| Jen and Neil | | Jen and Neil | ||
Line 258: | Line 258: | ||
| | | | ||
|- | |- | ||
- | | 30/06/2009 | + | | 30/06/2009 – 01/10/2009 |
| The synthesized sequence is delivered to us | | The synthesized sequence is delivered to us | ||
| all | | all | ||
- | | | + | | Done/ongoing |
| | | | ||
| | | | ||
|- | |- | ||
- | | 01/07/2009 – | + | | 01/07/2009 – 21/10/2009 |
| Lab notebook on IGEM wiki | | Lab notebook on IGEM wiki | ||
| Arun | | Arun | ||
Line 290: | Line 290: | ||
| √ | | √ | ||
|- | |- | ||
- | | 20/07/2009 – | + | | 20/07/2009 – 25/09/2009 |
| T-shirts are designed | | T-shirts are designed | ||
| Hanny | | Hanny | ||
- | | | + | | Done |
| | | | ||
|- | |- | ||
Line 308: | Line 308: | ||
| √ | | √ | ||
|- | |- | ||
- | | <SPAN style="BACKGROUND: yellow">01/08/2009 – 06/ | + | | <SPAN style="BACKGROUND: yellow">01/08/2009 – 06/10/2009</SPAN> |
| Characterize or improve an existing BioBrick Part or Device that was distributed via the iGEM BioBrick Parts collection, and enter this information back on the Registry. <SPAN style="COLOR: #9900ff">[GOLD 4]</SPAN> | | Characterize or improve an existing BioBrick Part or Device that was distributed via the iGEM BioBrick Parts collection, and enter this information back on the Registry. <SPAN style="COLOR: #9900ff">[GOLD 4]</SPAN> | ||
| Jessica | | Jessica | ||
Line 314: | Line 314: | ||
| | | | ||
|- | |- | ||
- | | <SPAN style="BACKGROUND: yellow">03/08/2009 – | + | | <SPAN style="BACKGROUND: yellow">03/08/2009 – 01/10/2009</SPAN> |
| T-shirts are bought | | T-shirts are bought | ||
| Hanny | | Hanny | ||
- | | | + | | Ongoing |
| | | | ||
|- | |- | ||
- | | <SPAN style="BACKGROUND: yellow"> | + | | <SPAN style="BACKGROUND: yellow">10/10/2009</SPAN> |
| IGEM Wiki review | | IGEM Wiki review | ||
- | | | + | | Mat |
| Ongoing | | Ongoing | ||
| | | | ||
|- | |- | ||
- | | <SPAN style="BACKGROUND: yellow">05/08/2009 – | + | | <SPAN style="BACKGROUND: yellow">05/08/2009 – 11/10/2009</SPAN> |
| Enter information detailing at least one new standard BioBrick Part or Device in the Registry of Parts <SPAN style="COLOR: red">[BRONZE 2]</SPAN> | | Enter information detailing at least one new standard BioBrick Part or Device in the Registry of Parts <SPAN style="COLOR: red">[BRONZE 2]</SPAN> | ||
| Hanny | | Hanny | ||
Line 332: | Line 332: | ||
| | | | ||
|- | |- | ||
- | | <SPAN style="BACKGROUND: yellow">10/08/2009 - | + | | <SPAN style="BACKGROUND: yellow">10/08/2009 - 10/10/2009</SPAN> |
| T-shirts are printed | | T-shirts are printed | ||
| Hanny | | Hanny | ||
Line 338: | Line 338: | ||
| | | | ||
|- | |- | ||
- | | <SPAN style="BACKGROUND: yellow">18/ | + | | <SPAN style="BACKGROUND: yellow">18/10/2009</SPAN> |
| IGEM Wiki review | | IGEM Wiki review | ||
| Goksel | | Goksel | ||
Line 344: | Line 344: | ||
| | | | ||
|- | |- | ||
- | | <SPAN style="BACKGROUND: yellow">19/08/2009 – 06/ | + | | <SPAN style="BACKGROUND: yellow">19/08/2009 – 06/10/2009</SPAN> |
| Develop and document a new technical standard <SPAN style="COLOR: #9900ff">[GOLD 3]</SPAN> | | Develop and document a new technical standard <SPAN style="COLOR: #9900ff">[GOLD 3]</SPAN> | ||
| Jessica - Craig | | Jessica - Craig | ||
Line 350: | Line 350: | ||
| | | | ||
|- | |- | ||
- | | <SPAN style="BACKGROUND: yellow">24/08/2009 – | + | | <SPAN style="BACKGROUND: yellow">24/08/2009 – 20/10/2009</SPAN> |
| Demonstrate that at least one new BioBrick Part or Device of your own design and construction works as expected <SPAN style="COLOR: #ff9900">[SILVER 1]</SPAN> | | Demonstrate that at least one new BioBrick Part or Device of your own design and construction works as expected <SPAN style="COLOR: #ff9900">[SILVER 1]</SPAN> | ||
| Arun | | Arun | ||
Line 359: | Line 359: | ||
| MSc Thesis submitted | | MSc Thesis submitted | ||
| Craig and Hanny | | Craig and Hanny | ||
- | | | + | | Done |
| √ | | √ | ||
|- | |- | ||
- | | 31/08/2009 – | + | | 31/08/2009 – 15/10/2009 |
| Characterize the operation of at least one new BioBrick Part or Device and enter this information on the Parts or Device page via the Registry of Parts (see [http://parts.mit.edu/registry/index.php/Part:BBa_F2620 BBa_F2620] for an exemplar). <SPAN style="COLOR: #ff9900">[SILVER 2]</SPAN> | | Characterize the operation of at least one new BioBrick Part or Device and enter this information on the Parts or Device page via the Registry of Parts (see [http://parts.mit.edu/registry/index.php/Part:BBa_F2620 BBa_F2620] for an exemplar). <SPAN style="COLOR: #ff9900">[SILVER 2]</SPAN> | ||
| Jessica | | Jessica | ||
Line 368: | Line 368: | ||
| | | | ||
|- | |- | ||
- | | 31/08/2009 – 16/ | + | | 31/08/2009 – 16/10/2009 |
| Model refinement | | Model refinement | ||
| | | | ||
Line 374: | Line 374: | ||
| √ | | √ | ||
|- | |- | ||
- | | 01/ | + | | 01/10/2009 |
| Group meeting to discuss presentation | | Group meeting to discuss presentation | ||
| all | | all | ||
Line 380: | Line 380: | ||
| | | | ||
|- | |- | ||
- | | 07/09/2009 – 10/ | + | | 07/09/2009 – 10/10/2009 |
| Design the poster <SPAN style="COLOR: red">[BRONZE 3 - a]</SPAN> | | Design the poster <SPAN style="COLOR: red">[BRONZE 3 - a]</SPAN> | ||
| Hanny | | Hanny | ||
Line 392: | Line 392: | ||
| | | | ||
|- | |- | ||
- | | | + | | 08/10/2009 |
| Group meeting to put presentation ideas together | | Group meeting to put presentation ideas together | ||
| all | | all | ||
Line 401: | Line 401: | ||
| Everyone to apply for ESTA (US Visa) | | Everyone to apply for ESTA (US Visa) | ||
| all | | all | ||
- | | | + | | Done |
| | | | ||
|- | |- | ||
Line 407: | Line 407: | ||
| Jamboree attendance fee due | | Jamboree attendance fee due | ||
| Jen and Neil | | Jen and Neil | ||
- | | | + | | Done |
| √ | | √ | ||
|- | |- | ||
- | | | + | | 21/10/2009 |
| Finish IGEM wiki <SPAN style="COLOR: red">[BRONZE 5]</SPAN> | | Finish IGEM wiki <SPAN style="COLOR: red">[BRONZE 5]</SPAN> | ||
| Mathew | | Mathew | ||
Line 419: | Line 419: | ||
| Check if we need to make a request for variance | | Check if we need to make a request for variance | ||
| Arun | | Arun | ||
- | | | + | | Done |
| | | | ||
|- | |- |
Revision as of 12:36, 29 September 2009
Dates | Tasks | Task Assigned To | Status | No Change in Dates | |
---|---|---|---|---|---|
05/02/2009 – 26/02/2009 | Shorlist feasible projects | Matthew | Done | ||
12/02/2009 – 20/02/2009 | IGEM Internal Wiki Setup | Dan | Done | ||
12/02/2009 – 13/02/2009 | Apply for funding – Matthew Robinson | Mathew | Done | ||
12/02/2009 – 16/02/2009 | Apply for funding – Arunkumar | Arun | Done | ||
12/02/2009 – 13/03/2009 | Apply for funding – Jessica | Jessica | Done | ||
16/02/2009 | IGEM 2009 registration opens | Jen and Neil | Done | ||
17/02/2009 – 23/02/2009 | Getting familiar with MediaWiki | All | Done | ||
19/02/2009 | Score all ideas for feasibility | Jessica | Done | ||
23/02/2009 – 08/03/2009 | Getting familiar with Biobrick standards and some characterized Biobricks | All | Done | ||
23/02/2009 – 09/03/2009 | IGEM Internal Wiki initial design is finished. Meeting notes, timelines and initial ideas are entered to the wiki | Craig | Done | ||
25/02/2009 | Create front page of the wiki (IGEM's) | Goksel | Done | ||
26/02/2009 – 12/03/2009 | Decide on the IGEM project | all | Done | ||
03/03/2009 | Inspect other awards | Craig | Done | ||
05/03/2009 – present | Allocate sub-projects/jobs | All | Done | ||
05/03/2009 – 19/03/2009 | Decide on the project title | All | Done | ||
05/03/2009 – 26/03/2009 | Design the project logo | Hanny | Done | ||
12/03/2009 – 01/08/2009 | Design of modelling related sub-projects/tasks | Goksel | Done | √ | |
19/03/2009 | Review of registration. Make sure everything is done. | Jen and Neil | Done | ||
20/03/2009 – 20/04/2009 | Easter Vacation | Arun: 4 weeks - Matthew: Last week - Craig: 1 week | Done | ||
20/03/2009 – 20/06/2009 | Create flyers for sponsors | Mathew | Done | ||
26/03/2009 - 10/10/2009 | Implementation of modelling related sub-projects/tasks | James, Goksel and Hanny | Ongoing | √ | |
26/03/2009 – 03/08/2009 | Find Sponsors | Mat/Arun | Done | ||
31/03/2009 | IGEM 2008 registration closes; Team registration fee due | Jen and Neil | Done | √ | |
01/04/2009 – 03/04/2009 | IGEM wiki creation | Mathew/James | Done | ||
11/10/2009 | Review of modelling tasks | Hanny | Ongoing | ||
25/04/2009 – 30/04/2009 | Review of BioBrick standards | Arun | Done | ||
25/04/2009 | provisional sequentia tutorial | all | Done | ||
20/06/2009 – 21/06/2009 | IGEM Workshop, Europe | Jen | Done | √ | |
01/07/2009 – 21/10/2009 | Outline and detail a new approach to an issue of Human Practice in synthetic biology as it relates to your project, such as safety, security, ethics, or ownership, sharing, and innovation. [GOLD 1] | all | |||
24/06/2009 - 31/08/2009 | Help another iGEM team by, for example, charactering a part, debugging a construct, or modeling or simulating their system [GOLD 2] | all | Done | ||
11/05/2009 | Start revision period | Arun,Jessica, Mathew | Done | √ | |
11/05/2009 – 14/05/2009 | Create the sequence to be synthesized according to the standards [BRONZE 1] | Arun | Done | √ | |
15/05/2009 | Send the DNA sequence to be synthesized | Arun | Done | √ | |
06/2009 | BioBrick parts sent to teams | all | Done | ||
28/05/2009 | Review the dates of Jamboree for booking the flights and hotels. | Goksel | Done | ||
20/07/2009 | Book the flights and hotel rooms | Jen and Neil | Done | ||
01/06/2009 – 12/06/2009 | Exam Period | Arun,Jessica, Mathew | Done | √ | |
15/06/2009 | Preliminary team rosters due | Jen and Neil | Done | ||
29/06/2009 – 22/07/2009 | Lab refresher training | All | Done | √ | |
26/06/2009 | Goksel - PhD:Application for Research Project Approval Form to be submitted | Goksel | Done | √ | |
29/06/2009 – 31/08/2009 | Lab work | Mathew, et al. | Ongoing | ||
30/06/2009 – 01/10/2009 | The synthesized sequence is delivered to us | all | Done/ongoing | ||
01/07/2009 – 21/10/2009 | Lab notebook on IGEM wiki | Arun | Ongoing | ||
01/07/2009 - 21/07/2009 | Apply for visas | All | Done | √ | |
28/07/2009 – 15/08/2009 | Familiarise with sequencing programs (Sequencher, Clone manager) | all | Done | √ | |
15/07/2009 | Goksel - PhD project proposal presentation | Goksel | Done | √ | |
20/07/2009 – 25/09/2009 | T-shirts are designed | Hanny | Done | ||
01/08/2009 | Team project descriptions due | Jess | Done | √ | |
01/08/2009 – 27/08/2009 | MSc thesis writing | Craig and Hanny | Done | √ | |
01/08/2009 – 06/10/2009 | Characterize or improve an existing BioBrick Part or Device that was distributed via the iGEM BioBrick Parts collection, and enter this information back on the Registry. [GOLD 4] | Jessica | |||
03/08/2009 – 01/10/2009 | T-shirts are bought | Hanny | Ongoing | ||
10/10/2009 | IGEM Wiki review | Mat | Ongoing | ||
05/08/2009 – 11/10/2009 | Enter information detailing at least one new standard BioBrick Part or Device in the Registry of Parts [BRONZE 2] | Hanny | |||
10/08/2009 - 10/10/2009 | T-shirts are printed | Hanny | |||
18/10/2009 | IGEM Wiki review | Goksel | Ongoing | ||
19/08/2009 – 06/10/2009 | Develop and document a new technical standard [GOLD 3] | Jessica - Craig | |||
24/08/2009 – 20/10/2009 | Demonstrate that at least one new BioBrick Part or Device of your own design and construction works as expected [SILVER 1] | Arun | |||
28/08/2009 | MSc Thesis submitted | Craig and Hanny | Done | √ | |
31/08/2009 – 15/10/2009 | Characterize the operation of at least one new BioBrick Part or Device and enter this information on the Parts or Device page via the Registry of Parts (see BBa_F2620 for an exemplar). [SILVER 2] | Jessica | |||
31/08/2009 – 16/10/2009 | Model refinement | √ | |||
01/10/2009 | Group meeting to discuss presentation | all | |||
07/09/2009 – 10/10/2009 | Design the poster [BRONZE 3 - a] | Hanny | |||
10/09/2009 – 17/10/2009 | Print the poster and pick it up [BRONZE 3 - a] | Jessica | |||
08/10/2009 | Group meeting to put presentation ideas together | all | |||
15/09/2009 | Everyone to apply for ESTA (US Visa) | all | Done | ||
17/09/2009 | Jamboree attendance fee due | Jen and Neil | Done | √ | |
21/10/2009 | Finish IGEM wiki [BRONZE 5] | Mathew | |||
19/09/2009 | Check if we need to make a request for variance | Arun | Done | ||
19/09/2009 – 26/09/2009 | Create EMBL and FASTA files for Biobricks | Hanny | |||
28/09/2009 | Send the parts to the registry | Jen and Neil | √ | ||
01/10/2009 | Track selection internal deadline | Goksel | |||
01/10/2009 | Project abstracts internal deadline | Craig | |||
01/10/2009 | Team rosters internal deadline | Arun | |||
08/10/2009 [TBD] | Request for variance due (notice and description of any use of non-standard parts or devices schemes due | Arun | √ | ||
08/10/2009 [TBD] | Track selection due | Goksel | √ | ||
08/10/2009 [TBD] | Project abstracts due | Craig | √ | ||
15/10/2009 [TBD] | Team rosters due | Jen and Neil | √ | ||
16/10/2009 | Check Wiki for fine tune | Craig | |||
23/10/2009 | Presentation fine tune and drafting | all | |||
29/10/2009 [TBD] | Project and part documentation due, including documentation for all medal criteria. Successfully complete and submit a Project Summary form [BRONZE 5] | ??? | |||
29/10/2009 | BioBrick Part DNA needs to be received by the Registry [BRONZE 6] | Neil and Jen | √ | ||
23/10/2009 | Enter EMBL and FASTA files for Biobricks on IGEM website | Neil and Jen | √ | ||
23/10/2009 | IGEM Wiki is closed | Craig | √ | ||
30/10/2009 – 02/11/2009 | Bring the poster to the Jamboree | Jessica | √ | ||
29/10/2009 – 04/11/2009 | Competition Jamboree, MIT, USA | all | √ | ||
30/10/2009 – 02/11/2009 | Present a Poster and Talk at the iGEM Jamboree [BRONZE 3 - b] | all | √ |
News
Events
- 20 – 21 June 2009 - Europe workshop (London)
- 23 – 24 June 2009 - UK iGEM meetup (Edinburgh)
- 23 October Practice Presentation (Newcastle)
- 23 October T-shirts are ready
- 27 October Practice Presentation (Sunderland)
- 27 October Poster is ready
- 30 October – 2 November 2009 - Jamboree (Boston)
Social Net