Team:Newcastle/Meetings/13 August 2009
From 2009.igem.org
(Difference between revisions)
(New page: {{:Team:Newcastle/CSS}} {{:Team:Newcastle/Header}} {{:Team:Newcastle/Left}} == 6 August 2009 - iGEM Meeting == * Chair: Goksel * Students: * Minutes: Jess * Instructors: * Advisors: =...) |
(→Action Points during last meeting) |
||
Line 17: | Line 17: | ||
=== Action Points during last meeting === | === Action Points during last meeting === | ||
* Design biobricks and primers in Sequencher. | * Design biobricks and primers in Sequencher. | ||
- | * Submit Preliminary Project Track details to iGEM HQ by 7 August | + | * Submit Preliminary Project Track details to iGEM HQ by 7 August. |
* Change NheI cutsite with another cutsite in teh designs since it is used in the integration vectors | * Change NheI cutsite with another cutsite in teh designs since it is used in the integration vectors | ||
* Find the integration vector to use at the lab | * Find the integration vector to use at the lab | ||
Line 23: | Line 23: | ||
* Use pmutin4's promoter for the pspac promoter in the designs | * Use pmutin4's promoter for the pspac promoter in the designs | ||
* Do not knock out the original cotC in Bacillus subtilis strain | * Do not knock out the original cotC in Bacillus subtilis strain | ||
+ | * Write to the Cornell team for collaboration. | ||
+ | * Contact to Groningen team (Neil) | ||
* Ask Pr.Nigel Robinson if he wants to be an advisor (Mat) - Pending. | * Ask Pr.Nigel Robinson if he wants to be an advisor (Mat) - Pending. | ||
* Think about the project title; BacMan,the Quest to Sequester? - Morgan likes, accepted. | * Think about the project title; BacMan,the Quest to Sequester? - Morgan likes, accepted. |
Revision as of 09:12, 13 August 2009
Contents |
6 August 2009 - iGEM Meeting
- Chair: Goksel
- Students:
- Minutes: Jess
- Instructors:
- Advisors:
Agenda
- Lab Summary
- Review last week's action points
- Cloning strategies
Action Points during last meeting
- Design biobricks and primers in Sequencher.
- Submit Preliminary Project Track details to iGEM HQ by 7 August.
- Change NheI cutsite with another cutsite in teh designs since it is used in the integration vectors
- Find the integration vector to use at the lab
- Find out for which nongerminating strains is the protocol
- Use pmutin4's promoter for the pspac promoter in the designs
- Do not knock out the original cotC in Bacillus subtilis strain
- Write to the Cornell team for collaboration.
- Contact to Groningen team (Neil)
- Ask Pr.Nigel Robinson if he wants to be an advisor (Mat) - Pending.
- Think about the project title; BacMan,the Quest to Sequester? - Morgan likes, accepted.
- Need to put more pictures on the wiki (Mat).
- Collect pictures of the team from those who took pictures (Arun).
- Have a look at the shuttle vector that Cambridge submitted last year (Leave for later).
- Look at Groningen's BioBrick design (leave for later).
- Need to set up a meeting with Noel from Sunderland (Goksel).
- Put modelling stuff and presentations on the wiki (Mat).
- Are Millipore still a sponsor? (Arun).
- T-shirts to be designed.
New action points
Minutes
News
Events
- 20 – 21 June 2009 - Europe workshop (London)
- 23 – 24 June 2009 - UK iGEM meetup (Edinburgh)
- 23 October Practice Presentation (Newcastle)
- 23 October T-shirts are ready
- 27 October Practice Presentation (Sunderland)
- 27 October Poster is ready
- 30 October – 2 November 2009 - Jamboree (Boston)
Social Net
- Newcastle iGEM Twitter
- [http://www.facebook.com/home.php#/group.php?gid=131709337641 Newcastle on Facebook]
- [http://www.youtube.com/user/newcastle2009igem Newcastle Youtube Channel]