Team:Newcastle/Meetings/13 August 2009
From 2009.igem.org
(Difference between revisions)
TubularWorld (Talk | contribs) (→Action Points during last meeting) |
TubularWorld (Talk | contribs) |
||
(6 intermediate revisions not shown) | |||
Line 4: | Line 4: | ||
== 13 August 2009 - iGEM Meeting == | == 13 August 2009 - iGEM Meeting == | ||
+ | [[Image:Newcastle 13 August BSub Meeting board 1.jpg|thumb|The diagram on the board.]] | ||
+ | [[Image:Newcastle 13 August BSub Meeting board 2.jpg|thumb|The diagram on the board.]] | ||
* Chair: Goksel | * Chair: Goksel | ||
- | * Students: | + | * Students: Goksel, Jess, Arun, Mat, James, Jane |
* Minutes: Jess | * Minutes: Jess | ||
- | * Instructors: | + | * Instructors: Neil |
- | * Advisors: | + | * Advisors: Daniel, Morgan |
=== Agenda === | === Agenda === | ||
Line 15: | Line 17: | ||
*Tomorrow's and next week's lab plans. | *Tomorrow's and next week's lab plans. | ||
*Cloning strategies | *Cloning strategies | ||
+ | *Registration and bookings | ||
=== Action Points during last meeting === | === Action Points during last meeting === | ||
- | * Design biobricks and primers in Sequencher (Metal:Done/Stochastic: | + | * Design biobricks and primers in Sequencher (Metal:Done/Stochastic:/Tuning:?) |
* Submit Preliminary Project Track details to iGEM HQ by 7 August (done) | * Submit Preliminary Project Track details to iGEM HQ by 7 August (done) | ||
- | * Change NheI cutsite with another cutsite in | + | * Change NheI cutsite with another cutsite in the designs since it is used in the integration vectors (Done) |
- | * Find the integration vector to use at the lab | + | * Find the integration vector to use at the lab (Done) |
* Find out for which nongerminating strains is the protocol (done - both) | * Find out for which nongerminating strains is the protocol (done - both) | ||
- | * Use pmutin4's promoter for the pspac promoter in the designs | + | * Use pmutin4's promoter for the pspac promoter in the designs (done) |
* Do not knock out the original cotC in Bacillus subtilis strain (done) | * Do not knock out the original cotC in Bacillus subtilis strain (done) | ||
* Write to the Cornell team for collaboration (done) | * Write to the Cornell team for collaboration (done) | ||
Line 32: | Line 35: | ||
* Have a look at the shuttle vector that Cambridge submitted last year (Leave for later). | * Have a look at the shuttle vector that Cambridge submitted last year (Leave for later). | ||
* Look at Groningen's BioBrick design (leave for later). | * Look at Groningen's BioBrick design (leave for later). | ||
- | * Need to set up a meeting with Noel from Sunderland ( | + | * Need to set up a meeting with Noel from Sunderland (Mat-done). |
* Put modelling stuff and presentations on the wiki (Mat). | * Put modelling stuff and presentations on the wiki (Mat). | ||
* Are Millipore still a sponsor? (Arun). | * Are Millipore still a sponsor? (Arun). |
Latest revision as of 08:48, 27 August 2009
Contents |
13 August 2009 - iGEM Meeting
- Chair: Goksel
- Students: Goksel, Jess, Arun, Mat, James, Jane
- Minutes: Jess
- Instructors: Neil
- Advisors: Daniel, Morgan
Agenda
- Lab Summary
- Review last week's action points
- Tomorrow's and next week's lab plans.
- Cloning strategies
- Registration and bookings
Action Points during last meeting
- Design biobricks and primers in Sequencher (Metal:Done/Stochastic:/Tuning:?)
- Submit Preliminary Project Track details to iGEM HQ by 7 August (done)
- Change NheI cutsite with another cutsite in the designs since it is used in the integration vectors (Done)
- Find the integration vector to use at the lab (Done)
- Find out for which nongerminating strains is the protocol (done - both)
- Use pmutin4's promoter for the pspac promoter in the designs (done)
- Do not knock out the original cotC in Bacillus subtilis strain (done)
- Write to the Cornell team for collaboration (done)
- Contact to Groningen team (Neil)
- Ask Pr.Nigel Robinson if he wants to be an advisor (done)
- Think about the project title; BacMan,the Quest to Sequester? - Morgan likes, accepted.
- Need to put more pictures on the wiki (Mat).
- Collect pictures of the team from those who took pictures (Arun)- ongoing
- Have a look at the shuttle vector that Cambridge submitted last year (Leave for later).
- Look at Groningen's BioBrick design (leave for later).
- Need to set up a meeting with Noel from Sunderland (Mat-done).
- Put modelling stuff and presentations on the wiki (Mat).
- Are Millipore still a sponsor? (Arun).
- T-shirts to be designed.
New action points
Minutes
News
Events
- 20 – 21 June 2009 - Europe workshop (London)
- 23 – 24 June 2009 - UK iGEM meetup (Edinburgh)
- 23 October Practice Presentation (Newcastle)
- 23 October T-shirts are ready
- 27 October Practice Presentation (Sunderland)
- 27 October Poster is ready
- 30 October – 2 November 2009 - Jamboree (Boston)
Social Net
- Newcastle iGEM Twitter
- [http://www.facebook.com/home.php#/group.php?gid=131709337641 Newcastle on Facebook]
- [http://www.youtube.com/user/newcastle2009igem Newcastle Youtube Channel]