Team:Newcastle/Labwork/18 August 2009

From 2009.igem.org

(Difference between revisions)
(Sporulation Tuning/ Chassis Team)
(Sporulation Tuning/ Chassis Team)
Line 11: Line 11:
Today, the moment of truth, the recovery of spores cwlD seemed to have worked judging from the [https://2009.igem.org/Team:Newcastle/Labwork/17_August_2009#Recovery_of_cwlD_Spores results]. A big sigh of relief from our team.
Today, the moment of truth, the recovery of spores cwlD seemed to have worked judging from the [https://2009.igem.org/Team:Newcastle/Labwork/17_August_2009#Recovery_of_cwlD_Spores results]. A big sigh of relief from our team.
-
[[Image:Newcastle 18 August sleB Jane plate.jpg|thumb|200px|left|Jane plating out sleB and cwlJ germinated spores.]]
+
[[Image:Newcastle 18 August sleB Jane plate.jpg|thumb|160px|left|Jane plating out sleB and cwlJ germinated spores.]]
Since it has been confirmed that the problem was that insufficient lysozyme stock solution was added, and that the current amount of lysozyme stock solution now works, we proceeded with the treatment for the recovery of spores sleB and cwlJ. The only and main difference is that the spores after treatment were plated out on plates with Kan and Em antibiotic.
Since it has been confirmed that the problem was that insufficient lysozyme stock solution was added, and that the current amount of lysozyme stock solution now works, we proceeded with the treatment for the recovery of spores sleB and cwlJ. The only and main difference is that the spores after treatment were plated out on plates with Kan and Em antibiotic.
-
[[Image:Newcastle 18 August BSub fume.jpg|160px|Iodine crystals.]]
+
[[Image:Newcastle 18 August BSub fume.jpg|thumb200px|center|Iodine crystals.]]
-
[[Image:Newcastle 18 August BSub in fume 1.jpg|160px|The single colonies in the fume cabinet.]]
+
[[Image:Newcastle 18 August BSub in fume 1.jpg|200px|center|Performing the iodine test in the fume cabinet.]]
-
[[Image:Newcastle 18 August BSub in fume 2.jpg|160px|The single colonies in the fume cabinet.]]
+
We also did the iodine test which came back with relatively [https://2009.igem.org/Team:Newcastle/Labwork/17_August_2009#Iodine_Test_on_Transformed_Bacillus_subtilis_with_gfp-rrnb good results].
We also did the iodine test which came back with relatively [https://2009.igem.org/Team:Newcastle/Labwork/17_August_2009#Iodine_Test_on_Transformed_Bacillus_subtilis_with_gfp-rrnb good results].
-
[[Image:Team Newcastle 2009 iGEM 18-08-09 IMG 0451.JPG|200px|thumb|Jane and James preparing some LB solutions]]
+
[[Image:Team Newcastle 2009 iGEM 18-08-09 IMG 0451.JPG|160px|thumb|Jane and James preparing some LB solutions]]
Lastly, we made up a new batch of LB solution for common use.
Lastly, we made up a new batch of LB solution for common use.
Line 27: Line 26:
===Results===
===Results===
====Recovery of spores sleB and cwlJ====
====Recovery of spores sleB and cwlJ====
-
====Iodine Test on Transformed Bacillus subtilis with gfp-rrnb====
 
   
   

Revision as of 10:09, 12 October 2009


Team Newcastle 2009 iGEM ProbationaryP-Sign.PNG

Formal Lab Session - 18th August 2009

Sporulation Tuning/ Chassis Team

Summary

Today, the moment of truth, the recovery of spores cwlD seemed to have worked judging from the results. A big sigh of relief from our team.

Jane plating out sleB and cwlJ germinated spores.

Since it has been confirmed that the problem was that insufficient lysozyme stock solution was added, and that the current amount of lysozyme stock solution now works, we proceeded with the treatment for the recovery of spores sleB and cwlJ. The only and main difference is that the spores after treatment were plated out on plates with Kan and Em antibiotic.

Iodine crystals.
Performing the iodine test in the fume cabinet.

We also did the iodine test which came back with relatively good results.

Jane and James preparing some LB solutions

Lastly, we made up a new batch of LB solution for common use.

Results

Recovery of spores sleB and cwlJ


Metal Sensor Team

Introduction

So far, we have shown that our test transformation in Bacillus subtilis with pGFP-rrnb has worked; the plasmid has successfully integrated into the amyE gene of the Bacillus genome removing the bacteria’s ability to break down starch. Today, we need to transform some DH5α E.coli bacteria with a biobrick which we need for our metal sensing system. The BioBrick is called [http://partsregistry.org/Part:BBa_J33206 BBa_J33206] which is the Bacillus subtilis ars promoter and arsR gene plus E. coli lacZ and is carried on plasmid pSB1A2. Once we have prepared the BioBrick, we shall insert it into E.coli and grow the cultures on ampicillin plates.

As well as this, at some point in the near future we would also like to carry out a test PCR reaction on the genome of the Bacillus subtilis which will have the pGFP-rrnb plasmid integrated within it. Today we will need to set up the controls as well as the samples we intend to use in the test PCR.

Practical Outline

There are two tasks which need to be accomplished today:

  1. Transform some DH5α E.coli bacteria with BBa_J33206
    1. Rehydrate BBa_J33206 BioBrick
    2. Carry out heat shock transformation protocol
    3. Plate out cultures on ampicillin + LB plates
  2. Prepare samples and control for test PCR of B. subtilis genome containing pGFP-rrnb plasmid
    1. Grow overnights for 3 cultures extracted from plate containing wild type B. subtilis
    2. Grow overnights for 3 cultures extracted from plate containing B. subtilis + pGFP-rrnb.
    3. Keep plates containing wild type Bacillus subtilis and transformed Bacillus subtilis together in fridge.


Procedure

Transforming E.coli with BBa_J33206

Preparing the BioBrick

The BioBrick BBa_J33206 is found in the spring distributions in plate 1 and in well 9D. Following recommendations given on the Parts Registry website, 15µl of distilled sterile water was added. The mixture of water and dehydrated DNA was then mixed using the pipette before being placed into an Eppendorf tube. The Eppendorf tube was then transferred to the -20°C freezer.

Carrying out the transformation

To carry out the transformation of DH5α E.coli cells, Phil Aldridge’s protocol for heat shock transformation was used. All the steps were followed except for:

Step 5 – The cells were left in the ice for 15 minutes instead of the 30 minutes suggested on the protocol page. 15 minutes is actually sufficient time.

This is the summary of the steps for this transformation:

  • The premade competent DH5α E.coli cells were transferred from the -80°C freezer and into an ice bucket. In the meantime, the water bath was switched on and set to 45°C.


  • Once a quick vortex was given, 5µl of the BBa_J33206 BioBrick was added to the solution. The Eppendorf tube containing the cells was then placed in the ice bucket for 15 minutes.


  • Once 30 minutes had elapsed, the tubes were introduced to the 45°C water bath for strictly 50 seconds before being returned to the ice for 2 minutes.


  • 0.9ml of LB was then added to the Eppendorf tube and left to grow in the 37°C incubator for 60 minutes.


Plating out the ‘transformed’ bacteria

After the transformation steps had been accomplished, 200µl of the LB solution containing E.coli cells was then spread onto 1 plate containing LB + ampicillin. The plasmid to which the BioBrick BBa_J33206 is attached, the pSB1A2 plasmid, confers ampicillin resistance so a selection pressure of ampicillin should be applied. The plate was then labelled and stored in the 37°C incubator.

Preparing PCR reactions for Bacillus subtilis containing pGFP-rrnb

In order to prepare for the test PCR reactions (the date of which is decided by the arrival of the primers), samples have to be made ready. The samples which are intended for preparation are:

  • 3 overnights for 3 cultures extracted from plate containing wild type B. subtilis
  • 3 overnights for 3 cultures extracted from plate containing B. subtilis + pGFP-rrnb.
  • 3 cultures (taken on the day) from plate containing wild type Bacillus subtilis
  • 3 cultures (taken on the day) from plate containing Bacillus subtilis along with the integrated pGFP-rrnb insert.
  • 1 x distilled water


Today, the overnight cultures were prepared by getting a total of six test-tubes out and labelled correctly. To all of the tubes, under aseptic conditions, 3ml LB was inserted. Into the first three tubes in the rack, 3 colonies from a plate containing wild type Bacillus subtilis were added and into the remaining three tubes, 3 colonies from the plate containing B. subtilis plus pGFP-rrnb (the plate which had 200µl of cells spread onto it) were added.

The two plates from which these colonies came from were then stored in the fridge for later use. The tubes were inserted into the orbital shaking incubator at 37°C for overnight growth.

Stochastic Switch Team

Jess doing her bit for the lab community - refilling pipette tip boxes

Summary

Today we discovered that the transfromations done on the 17th were done incorrectly and there was no growth on the plates we had prepared. We decided to redo the transfromations using the appropriate protocol. We were using the same bricks as Monday: R0062; R0079; C0161; C0179; J44000; C0178; C0062

We carried out the transformations into competent E.coli DH5alpha cells that had been frozen down into the -80 freezer, using the protocol from Phil's lab. We plated the final cultures out onto LB+Amp plates and, following the protocol, prayed.

July
MTWTFSS
    [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/1_July_2009&action=edit 1] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/2_July_2009&action=edit 2] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/3_July_2009&action=edit 3] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/4_July_2009&action=edit 4] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/5_July_2009&action=edit 5]
[http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/6_July_2009&action=edit 6] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/7_July_2009&action=edit 7] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/8_July_2009&action=edit 8] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/9_July_2009&action=edit 9] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/10_July_2009&action=edit 10] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/11_July_2009&action=edit 11] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/12_July_2009&action=edit 12]
[http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/13_July_2009&action=edit 13] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/14_July_2009&action=edit 14] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/15_July_2009&action=edit 15] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/16_July_2009&action=edit 16] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/17_July_2009&action=edit 17] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/18_July_2009&action=edit 18] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/19_July_2009&action=edit 19]
[http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/20_July_2009&action=edit 20] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/21_July_2009&action=edit 21] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/22_July_2009&action=edit 22] [http://2009.igem.org/Team:Newcastle/Labwork/23_July_2009 23] [http://2009.igem.org/Team:Newcastle/Labwork/24_July_2009 24] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/25_July_2009&action=edit 25] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/26_July_2009&action=edit 26]
[http://2009.igem.org/Team:Newcastle/Labwork/27_July_2009 27] [http://2009.igem.org/Team:Newcastle/Labwork/28_July_2009 28] [http://2009.igem.org/Team:Newcastle/Labwork/29_July_2009 29] [http://2009.igem.org/Team:Newcastle/Labwork/30_July_2009 30] [http://2009.igem.org/Team:Newcastle/Labwork/31_July_2009 31]
August
MTWTFSS
          [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/1_August_2009&action=edit 1] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/2_August_2009&action=edit 2]
[http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/3_August_2009&action=edit 3] [http://2009.igem.org/Team:Newcastle/Labwork/4_August_2009 4] [http://2009.igem.org/Team:Newcastle/Labwork/5_August_2009 5] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/6_August_2009&action=edit 6] [http://2009.igem.org/Team:Newcastle/Labwork/7_August_2009 7] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/8_August_2009&action=edit 8] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/9_August_2009&action=edit 9]
[http://2009.igem.org/Team:Newcastle/Labwork/10_August_2009 10] [http://2009.igem.org/Team:Newcastle/Labwork/11_August_2009 11] [http://2009.igem.org/Team:Newcastle/Labwork/12_August_2009 12] [http://2009.igem.org/Team:Newcastle/Labwork/13_August_2009 13] [http://2009.igem.org/Team:Newcastle/Labwork/14_August_2009 14] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/15_August_2009&action=edit 15] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/16_August_2009&action=edit 16]
[http://2009.igem.org/Team:Newcastle/Labwork/17_August_2009 17] [http://2009.igem.org/Team:Newcastle/Labwork/18_August_2009 18] [http://2009.igem.org/Team:Newcastle/Labwork/19_August_2009 19] [http://2009.igem.org/Team:Newcastle/Labwork/20_August_2009 20] [http://2009.igem.org/Team:Newcastle/Labwork/21_August_2009 21] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/22_August_2009&action=edit 22] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/23_August_2009&action=edit 23]
[http://2009.igem.org/Team:Newcastle/Labwork/24_August_2009 24] [http://2009.igem.org/Team:Newcastle/Labwork/25_August_2009 25] [http://2009.igem.org/Team:Newcastle/Labwork/26_August_2009 26] [http://2009.igem.org/Team:Newcastle/Labwork/27_August_2009 27] [http://2009.igem.org/Team:Newcastle/Labwork/28_August_2009 28] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/29_August_2009&action=edit 29] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/30_August_2009&action=edit 30]
[http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/31_August_2009&action=edit 31]
September
MTWTFSS
  [http://2009.igem.org/Team:Newcastle/Labwork/1_September_2009 1] [http://2009.igem.org/Team:Newcastle/Labwork/2_September_2009 2] [http://2009.igem.org/Team:Newcastle/Labwork/3_September_2009 3] [http://2009.igem.org/Team:Newcastle/Labwork/4_September_2009 4] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/5_September_2009&action=edit 5] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/6_September_2009&action=edit 6]
[http://2009.igem.org/Team:Newcastle/Labwork/7_September_2009 7] [http://2009.igem.org/Team:Newcastle/Labwork/8_September_2009 8] [http://2009.igem.org/Team:Newcastle/Labwork/9_September_2009 9] [http://2009.igem.org/Team:Newcastle/Labwork/10_September_2009 10] [http://2009.igem.org/Team:Newcastle/Labwork/11_September_2009 11] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/12_September_2009&action=edit 12] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/13_September_2009&action=edit 13]
[http://2009.igem.org/Team:Newcastle/Labwork/14_September_2009 14] [http://2009.igem.org/Team:Newcastle/Labwork/15_September_2009 15] [http://2009.igem.org/Team:Newcastle/Labwork/16_September_2009 16] [http://2009.igem.org/Team:Newcastle/Labwork/17_September_2009 17] [http://2009.igem.org/Team:Newcastle/Labwork/18_September_2009 18] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/19_September_2009&action=edit 19] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/20_September_2009&action=edit 20]
[http://2009.igem.org/Team:Newcastle/Labwork/21_September_2009 21] [http://2009.igem.org/Team:Newcastle/Labwork/22_September_2009 22] [http://2009.igem.org/Team:Newcastle/Labwork/23_September_2009 23] [http://2009.igem.org/Team:Newcastle/Labwork/24_September_2009 24] [http://2009.igem.org/Team:Newcastle/Labwork/25_September_2009 25] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/26_September_2009&action=edit 26] [http://2009.igem.org/wiki/index.php?title=Team:Newcastle/Labwork/27_September_2009&action=edit 27]
[http://2009.igem.org/Team:Newcastle/Labwork/28_September_2009 28] [http://2009.igem.org/Team:Newcastle/Labwork/29_September_2009 29] [http://2009.igem.org/Team:Newcastle/Labwork/30_September_2009 30]





News

Events

Social Net

  • Newcastle iGEM Twitter
  • [http://www.facebook.com/home.php#/group.php?gid=131709337641 Newcastle on Facebook]
  • [http://www.youtube.com/user/newcastle2009igem Newcastle Youtube Channel]