Team:Groningen/Project Plan/Risk List

From 2009.igem.org

(Difference between revisions)
m (Template header.)
Line 2: Line 2:
[[Category:Team:Groningen/Disciplines/Project_Management|Project Plan/Risk List]]
[[Category:Team:Groningen/Disciplines/Project_Management|Project Plan/Risk List]]
[[Category:Team:Groningen/Roles/Project_Manager|Project Plan/Risk List]]
[[Category:Team:Groningen/Roles/Project_Manager|Project Plan/Risk List]]
 +
 +
==Introduction==
Every project has to deal with risks. To ensure a smoothly running project without too many large hiccups it is important to identify these risks and develop strategies to avoid them (and/or reduce their impact).
Every project has to deal with risks. To ensure a smoothly running project without too many large hiccups it is important to identify these risks and develop strategies to avoid them (and/or reduce their impact).
 +
 +
The table below, shows the possible risks that may influence the success of the iGEM project. It gives an outline of 5 main risks, namely problems which emerge from finances, time span, lab work, modeling and members / instructors. Possible risks were traced from the problems of iGEM Groningen 2008 and of the iGEM 2008 teams which were withdrawn from the competition.
Also see [http://www.upedu.org/upedu/process/artifact/ar_rskls.htm UPEDU's description of the Risk List] artifact and the enclosing artifact, [[Team:Groningen/Project_Plan|our project plan]].
Also see [http://www.upedu.org/upedu/process/artifact/ar_rskls.htm UPEDU's description of the Risk List] artifact and the enclosing artifact, [[Team:Groningen/Project_Plan|our project plan]].
Line 11: Line 15:
*Identifier: a descriptive (short) name
*Identifier: a descriptive (short) name
-
*Magnitude: one of the following numbers:
+
*Magnitude: ranking from 1-10, 1 is low risk and 10 is a high risk. Taking in account: how probable and severe the problem is.
-
*#Minor nuisance
+
-
*#Bad, but not insurmountable
+
-
*#Show stopper
+
*Description/Impact: a brief description of the risk and how it impacts our project.
*Description/Impact: a brief description of the risk and how it impacts our project.
*Indicators: when do we know this risk has materialized (or better yet, is about to materialize).
*Indicators: when do we know this risk has materialized (or better yet, is about to materialize).
Line 32: Line 33:
|NoFunding
|NoFunding
|2
|2
 +
|If we do not get any more funding we may not be able to cover our budget. This may mean that some things will not be possible.
 +
|Our budget should largely be covered before the summer.
 +
|We already have some funds and are attempting to acquire more.
 +
|TODO: We should identify some things that could be scrapped if really necessary.
 +
|}
 +
 +
{| border="1"
 +
|+Finances
 +
!Magnitude
 +
!Description
 +
!Impact
 +
!Mitigation Plan
 +
!Contingency Plan
 +
|-
 +
|NoFunding
 +
|6
|If we do not get any more funding we may not be able to cover our budget. This may mean that some things will not be possible.
|If we do not get any more funding we may not be able to cover our budget. This may mean that some things will not be possible.
|Our budget should largely be covered before the summer.
|Our budget should largely be covered before the summer.

Revision as of 14:38, 2 May 2009

[http://2009.igem.org/Team:Groningen http://2009.igem.org/wiki/images/f/f1/Igemhomelogo.png]

Introduction

Every project has to deal with risks. To ensure a smoothly running project without too many large hiccups it is important to identify these risks and develop strategies to avoid them (and/or reduce their impact).

The table below, shows the possible risks that may influence the success of the iGEM project. It gives an outline of 5 main risks, namely problems which emerge from finances, time span, lab work, modeling and members / instructors. Possible risks were traced from the problems of iGEM Groningen 2008 and of the iGEM 2008 teams which were withdrawn from the competition.

Also see [http://www.upedu.org/upedu/process/artifact/ar_rskls.htm UPEDU's description of the Risk List] artifact and the enclosing artifact, our project plan.

Risks

For each risk the following is documented:

  • Identifier: a descriptive (short) name
  • Magnitude: ranking from 1-10, 1 is low risk and 10 is a high risk. Taking in account: how probable and severe the problem is.
  • Description/Impact: a brief description of the risk and how it impacts our project.
  • Indicators: when do we know this risk has materialized (or better yet, is about to materialize).
  • Mitigation Strategy: how are we reducing the impact of this risk?
  • Contingency Plan: what can we do if this risk does materialize?

TODO: This is currently just an example, this still needs to be filled in!

Identifier Magnitude Description/Impact Indicators Mitigation Contingency Plan
NoFunding 2 If we do not get any more funding we may not be able to cover our budget. This may mean that some things will not be possible. Our budget should largely be covered before the summer. We already have some funds and are attempting to acquire more. TODO: We should identify some things that could be scrapped if really necessary.
Finances
Magnitude Description Impact Mitigation Plan Contingency Plan
NoFunding 6 If we do not get any more funding we may not be able to cover our budget. This may mean that some things will not be possible. Our budget should largely be covered before the summer. We already have some funds and are attempting to acquire more. TODO: We should identify some things that could be scrapped if really necessary.