Team:Newcastle/Meetings/13 August 2009

From 2009.igem.org

(Difference between revisions)
(New page: {{:Team:Newcastle/CSS}} {{:Team:Newcastle/Header}} {{:Team:Newcastle/Left}} == 6 August 2009 - iGEM Meeting == * Chair: Goksel * Students: * Minutes: Jess * Instructors: * Advisors: =...)
(Action Points during last meeting)
Line 17: Line 17:
=== Action Points during last meeting ===
=== Action Points during last meeting ===
* Design biobricks and primers in Sequencher.
* Design biobricks and primers in Sequencher.
-
* Submit Preliminary Project Track details to iGEM HQ by 7 August (TOMORROW!).
+
* Submit Preliminary Project Track details to iGEM HQ by 7 August.
* Change NheI cutsite with another cutsite in teh designs since it is used in the integration vectors
* Change NheI cutsite with another cutsite in teh designs since it is used in the integration vectors
* Find the integration vector to use at the lab
* Find the integration vector to use at the lab
Line 23: Line 23:
* Use pmutin4's promoter for the pspac promoter in the designs
* Use pmutin4's promoter for the pspac promoter in the designs
* Do not knock out the original cotC in Bacillus subtilis strain
* Do not knock out the original cotC in Bacillus subtilis strain
 +
* Write to the Cornell team for collaboration.
 +
* Contact to Groningen team (Neil)
* Ask Pr.Nigel Robinson if he wants to be an advisor (Mat) - Pending.
* Ask Pr.Nigel Robinson if he wants to be an advisor (Mat) - Pending.
* Think about the project title; BacMan,the Quest to Sequester? - Morgan likes, accepted.
* Think about the project title; BacMan,the Quest to Sequester? - Morgan likes, accepted.

Revision as of 09:12, 13 August 2009


Contents

6 August 2009 - iGEM Meeting

  • Chair: Goksel
  • Students:
  • Minutes: Jess
  • Instructors:
  • Advisors:

Agenda

  • Lab Summary
  • Review last week's action points
  • Cloning strategies

Action Points during last meeting

  • Design biobricks and primers in Sequencher.
  • Submit Preliminary Project Track details to iGEM HQ by 7 August.
  • Change NheI cutsite with another cutsite in teh designs since it is used in the integration vectors
  • Find the integration vector to use at the lab
  • Find out for which nongerminating strains is the protocol
  • Use pmutin4's promoter for the pspac promoter in the designs
  • Do not knock out the original cotC in Bacillus subtilis strain
  • Write to the Cornell team for collaboration.
  • Contact to Groningen team (Neil)
  • Ask Pr.Nigel Robinson if he wants to be an advisor (Mat) - Pending.
  • Think about the project title; BacMan,the Quest to Sequester? - Morgan likes, accepted.
  • Need to put more pictures on the wiki (Mat).
  • Collect pictures of the team from those who took pictures (Arun).
  • Have a look at the shuttle vector that Cambridge submitted last year (Leave for later).
  • Look at Groningen's BioBrick design (leave for later).
  • Need to set up a meeting with Noel from Sunderland (Goksel).
  • Put modelling stuff and presentations on the wiki (Mat).
  • Are Millipore still a sponsor? (Arun).
  • T-shirts to be designed.

New action points

Minutes




News

Events

Social Net

  • Newcastle iGEM Twitter
  • [http://www.facebook.com/home.php#/group.php?gid=131709337641 Newcastle on Facebook]
  • [http://www.youtube.com/user/newcastle2009igem Newcastle Youtube Channel]