Team:Groningen/Project Plan/Elaboration/1

From 2009.igem.org

(Difference between revisions)
(Plan: Roughly divided tasks over different roles.)
(Plan)
 
(5 intermediate revisions not shown)
Line 1: Line 1:
-
<noinclude>{{Team:Groningen/Header}}{{doneCounter}}
+
<noinclude>{{Team:Groningen/Header}}{{doneCounter}}</noinclude>
-
[[Category:Team:Groningen/Disciplines/Project_Management|Project_Plan/Inception/2]]
+
-
[[Category:Team:Groningen/Roles/Project_Manager|Project_Plan/Inception/2]]</noinclude>
+
===Plan===
===Plan===
End date: 2009-06-01
End date: 2009-06-01
Line 15: Line 13:
** Role not used (yet).
** Role not used (yet).
* [[:Category:Team:Groningen/Roles/Configuration Manager|Configuration Manager]]
* [[:Category:Team:Groningen/Roles/Configuration Manager|Configuration Manager]]
 +
** {{todo}} [[Team:Groningen/Configuration Management Plan|Configuration Management Plan]] mostly done.
* [[:Category:Team:Groningen/Roles/Designer|Designer]]
* [[:Category:Team:Groningen/Roles/Designer|Designer]]
**'''Tasks:'''
**'''Tasks:'''
Line 20: Line 19:
***Are there multiple BioBricks which can be used in case that one does not work.
***Are there multiple BioBricks which can be used in case that one does not work.
* [[:Category:Team:Groningen/Roles/Facility Manager|Facility Manager]]
* [[:Category:Team:Groningen/Roles/Facility Manager|Facility Manager]]
 +
** [[Team:Groningen/Configuration Management Plan|Configuration Management Plan]], at least the section "Tools, Environment, and Infrastructure" and "Configuration Identification" where applicable (and anything else needed to establish some basic procedures/conventions for our lab work) In short: Fix a lab, Fix equipment, Fix consumables.
* [[:Category:Team:Groningen/Roles/Implementer|Implementer]]
* [[:Category:Team:Groningen/Roles/Implementer|Implementer]]
**'''Objective:''' Have started with preparation labwork.
**'''Objective:''' Have started with preparation labwork.
Line 33: Line 33:
* [[:Category:Team:Groningen/Roles/Project Manager|Project Manager]]
* [[:Category:Team:Groningen/Roles/Project Manager|Project Manager]]
* [[:Category:Team:Groningen/Roles/Public Relations Officer|Public Relations Officer]]
* [[:Category:Team:Groningen/Roles/Public Relations Officer|Public Relations Officer]]
 +
**'''Objective:''' Get in contact with other teams and media
 +
**'''Tasks:'''
 +
***Get in contact with iGEM teams from Delft and Amsterdam, and organize a meeting at the end of June for trouble solving and getting to know eachother (Getting There)
 +
***Get in contact with the different "studie verenigingen" of the teammembers for publication of a short story about iGEM and the team (TODO)
 +
***
* [[:Category:Team:Groningen/Roles/Reviewer|Reviewer]]
* [[:Category:Team:Groningen/Roles/Reviewer|Reviewer]]
* [[:Category:Team:Groningen/Roles/Scribe|Scribe]]
* [[:Category:Team:Groningen/Roles/Scribe|Scribe]]
Line 40: Line 45:
**'''Tasks:'''
**'''Tasks:'''
***Try to find protocols for the characterization, to check feasibility. ???
***Try to find protocols for the characterization, to check feasibility. ???
-
 
-
===Resources===
 
-
[Resources needed for the iteration — material, human, financial, and so on.]
 
===Use Cases===
===Use Cases===
Line 49: Line 51:
===Evaluation Criteria===
===Evaluation Criteria===
[Functionality, performance, capacity, quality measures, quality goals, and so forth.]
[Functionality, performance, capacity, quality measures, quality goals, and so forth.]
 +
{{Team:Groningen/Footer}}

Latest revision as of 22:55, 21 October 2009

[http://2009.igem.org/Team:Groningen http://2009.igem.org/wiki/images/f/f1/Igemhomelogo.png]

Plan

End date: 2009-06-01

Overall objective: The initial design should be made, the requirements refined. Some initial model prototypes should be made to gain experience in modelling.

Tasks per role:

  • Analyst
    • Objective: Project requirements, feasibility and detailed project vision should be finished.
    • Tasks:
  • Change Control Manager
    • Role not used (yet).
  • Configuration Manager
  • Designer
    • Tasks:
      • Which bacterial strains, vectors and genes are needed.
      • Are there multiple BioBricks which can be used in case that one does not work.
  • Facility Manager
    • Configuration Management Plan, at least the section "Tools, Environment, and Infrastructure" and "Configuration Identification" where applicable (and anything else needed to establish some basic procedures/conventions for our lab work) In short: Fix a lab, Fix equipment, Fix consumables.
  • Implementer
    • Objective: Have started with preparation labwork.
    • Tasks:
      • What equipment is needed, communicate this with the facility manager.
      • Order BioBrick restiction enzymes / ligases (fast-digest, Fermentas).
      • Which chemicals / media are needed and can we use them from the MolGen department. Start ordering chemicals/media.
      • Work out a cloning strategy, to check feasibility.
      • Try to make a plan with project parts which can be done simultaneously.
  • Integrator
  • Modeller
  • Project Manager
  • Public Relations Officer
    • Objective: Get in contact with other teams and media
    • Tasks:
      • Get in contact with iGEM teams from Delft and Amsterdam, and organize a meeting at the end of June for trouble solving and getting to know eachother (Getting There)
      • Get in contact with the different "studie verenigingen" of the teammembers for publication of a short story about iGEM and the team (TODO)
  • Reviewer
  • Scribe
  • Stakeholder
  • Tester
  • Treasurer
    • Tasks:
      • Try to find protocols for the characterization, to check feasibility. ???

Use Cases

[List the use cases and scenarios that are being developed for this iteration.]

Evaluation Criteria

[Functionality, performance, capacity, quality measures, quality goals, and so forth.]