Team:Groningen/Project Plan/Elaboration/1
From 2009.igem.org
(Difference between revisions)
(Empty planning for elaboration 2.) |
m (Use doneCount template) |
||
Line 1: | Line 1: | ||
- | <noinclude>{{Team:Groningen/Header}} | + | <noinclude>{{Team:Groningen/Header}}{{doneCounter}} |
[[Category:Team:Groningen/Disciplines/Project_Management|Project_Plan/Inception/2]] | [[Category:Team:Groningen/Disciplines/Project_Management|Project_Plan/Inception/2]] | ||
[[Category:Team:Groningen/Roles/Project_Manager|Project_Plan/Inception/2]]</noinclude> | [[Category:Team:Groningen/Roles/Project_Manager|Project_Plan/Inception/2]]</noinclude> | ||
Line 8: | Line 8: | ||
Overall objective: The initial design should be made, the requirements refined. Some initial model prototypes should be made to gain experience in modelling. | Overall objective: The initial design should be made, the requirements refined. Some initial model prototypes should be made to gain experience in modelling. | ||
- | Tasks per role<span | + | Tasks per role<span class="doneCount"></span>: |
* [[:Category:Team:Groningen/Roles/Analyst|Analyst]] | * [[:Category:Team:Groningen/Roles/Analyst|Analyst]] | ||
Line 26: | Line 26: | ||
* [[:Category:Team:Groningen/Roles/Tester|Tester]] | * [[:Category:Team:Groningen/Roles/Tester|Tester]] | ||
* [[:Category:Team:Groningen/Roles/Treasurer|Treasurer]] | * [[:Category:Team:Groningen/Roles/Treasurer|Treasurer]] | ||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
===Resources=== | ===Resources=== |
Revision as of 14:29, 14 May 2009
[http://2009.igem.org/Team:Groningen http://2009.igem.org/wiki/images/f/f1/Igemhomelogo.png]
|
|
|
---|
Plan
End date: 2009-06-01
Overall objective: The initial design should be made, the requirements refined. Some initial model prototypes should be made to gain experience in modelling.
Tasks per role:
- Analyst
- Change Control Manager
- Role not used (yet).
- Configuration Manager
- Designer
- Facility Manager
- Implementer
- Integrator
- Modeller
- Project Manager
- Public Relations Officer
- Reviewer
- Scribe
- Stakeholder
- Tester
- Treasurer
Resources
[Resources needed for the iteration — material, human, financial, and so on.]
Use Cases
[List the use cases and scenarios that are being developed for this iteration.]
Evaluation Criteria
[Functionality, performance, capacity, quality measures, quality goals, and so forth.]
Retrieved from "http://2009.igem.org/Team:Groningen/Project_Plan/Elaboration/1"