Team:Groningen/Project Plan/Elaboration/1

From 2009.igem.org

(Difference between revisions)
(Plan: Roughly divided tasks over different roles.)
Line 10: Line 10:
* [[:Category:Team:Groningen/Roles/Analyst|Analyst]]
* [[:Category:Team:Groningen/Roles/Analyst|Analyst]]
 +
**'''Objective:''' Project requirements, feasibility and detailed project vision should be finished.
 +
**'''Tasks:'''
* [[:Category:Team:Groningen/Roles/Change Control Manager|Change Control Manager]]
* [[:Category:Team:Groningen/Roles/Change Control Manager|Change Control Manager]]
** Role not used (yet).
** Role not used (yet).
* [[:Category:Team:Groningen/Roles/Configuration Manager|Configuration Manager]]
* [[:Category:Team:Groningen/Roles/Configuration Manager|Configuration Manager]]
* [[:Category:Team:Groningen/Roles/Designer|Designer]]
* [[:Category:Team:Groningen/Roles/Designer|Designer]]
 +
**'''Tasks:'''
 +
***Which bacterial strains, vectors and genes are needed.
 +
***Are there multiple BioBricks which can be used in case that one does not work.
* [[:Category:Team:Groningen/Roles/Facility Manager|Facility Manager]]
* [[:Category:Team:Groningen/Roles/Facility Manager|Facility Manager]]
* [[:Category:Team:Groningen/Roles/Implementer|Implementer]]
* [[:Category:Team:Groningen/Roles/Implementer|Implementer]]
-
**'''Objective:''' Have started with preparation labwork. Project requirement, feasibility and detailed project vision should be finished.
+
**'''Objective:''' Have started with preparation labwork.
**'''Tasks:'''
**'''Tasks:'''
-
***Which bacterial strains, vectors and genes are needed.
 
***What equipment is needed, communicate this with the facility manager.
***What equipment is needed, communicate this with the facility manager.
-
***Are there multiple BioBricks which can be used in case that one does not work.
 
***Order BioBrick restiction enzymes / ligases (fast-digest, Fermentas).
***Order BioBrick restiction enzymes / ligases (fast-digest, Fermentas).
***Which chemicals / media are needed and can we use them from the MolGen department. Start ordering chemicals/media.
***Which chemicals / media are needed and can we use them from the MolGen department. Start ordering chemicals/media.
-
***Try to find protocols for the characterization, to check feasibility.
 
***Work out a cloning strategy, to check feasibility.
***Work out a cloning strategy, to check feasibility.
***Try to make a plan with project parts which can be done simultaneously.
***Try to make a plan with project parts which can be done simultaneously.
Line 36: Line 38:
* [[:Category:Team:Groningen/Roles/Tester|Tester]]
* [[:Category:Team:Groningen/Roles/Tester|Tester]]
* [[:Category:Team:Groningen/Roles/Treasurer|Treasurer]]
* [[:Category:Team:Groningen/Roles/Treasurer|Treasurer]]
 +
**'''Tasks:'''
 +
***Try to find protocols for the characterization, to check feasibility. ???
===Resources===
===Resources===

Revision as of 11:35, 18 May 2009

[http://2009.igem.org/Team:Groningen http://2009.igem.org/wiki/images/f/f1/Igemhomelogo.png]

Plan

End date: 2009-06-01

Overall objective: The initial design should be made, the requirements refined. Some initial model prototypes should be made to gain experience in modelling.

Tasks per role:

  • Analyst
    • Objective: Project requirements, feasibility and detailed project vision should be finished.
    • Tasks:
  • Change Control Manager
    • Role not used (yet).
  • Configuration Manager
  • Designer
    • Tasks:
      • Which bacterial strains, vectors and genes are needed.
      • Are there multiple BioBricks which can be used in case that one does not work.
  • Facility Manager
  • Implementer
    • Objective: Have started with preparation labwork.
    • Tasks:
      • What equipment is needed, communicate this with the facility manager.
      • Order BioBrick restiction enzymes / ligases (fast-digest, Fermentas).
      • Which chemicals / media are needed and can we use them from the MolGen department. Start ordering chemicals/media.
      • Work out a cloning strategy, to check feasibility.
      • Try to make a plan with project parts which can be done simultaneously.

Resources

[Resources needed for the iteration — material, human, financial, and so on.]

Use Cases

[List the use cases and scenarios that are being developed for this iteration.]

Evaluation Criteria

[Functionality, performance, capacity, quality measures, quality goals, and so forth.]