Team:Newcastle/Meetings/6 August 2009

From 2009.igem.org

(Difference between revisions)
(New action points)
Line 40: Line 40:
* Design biobricks and primers in Sequencher.
* Design biobricks and primers in Sequencher.
* Submit Preliminary Project Track details to iGEM HQ by 7 August (TOMORROW!).
* Submit Preliminary Project Track details to iGEM HQ by 7 August (TOMORROW!).
 +
* Change NheI cutsite with another cutsite in teh dsigns sine it is used in the integration vectors
 +
* Find the integration vector to use at the lab
=== Minutes ===
=== Minutes ===

Revision as of 08:54, 13 August 2009


Contents

6 August 2009 - iGEM Meeting

  • Chair: James
  • Students:
  • Minutes: Goksel
  • Instructors:
  • Advisors:

Agenda

  • Lab Summary
  • Sequencher usage
    • Protocol for recovering sleB/cwlJ, given one is for cwlD only.
    • Do we need another RBS between GFP and KinA (multiple CDS).
    • Do we need GFP in the biobrick design at all? (SpoTeam)
  • Review last week's action points
  • Any questions

Action Points during last meeting

  • Ask about project description (Jess) - Done.
  • Send BioBrick design to Neil (All).
  • Ask Pr.Nigel Robinson if he wants to be an advisor (Mat) - Pending.
  • Think about the project title; BacMan,the Quest to Sequester? - Morgan likes, accepted.
  • Need to put more pictures on the wiki (Mat).
  • Collect pictures of the team from those who took pictures (Arun).
  • Write personal descriptions on the wiki and ask the instructors and advisor to do so (Arun) - Part done.
  • Have a look at the shuttle vector that Cambridge submitted last year (Leave for later).
  • Look at Groningen's BioBrick design (leave for later).
  • Need to set up a meeting with Noel from Sunderland (Goksel).
  • Put modelling stuff and presentations on the wiki (Mat).
  • Need to calculate how much the stochastic BioBrick will cost (Jess).
  • The need for more money (Sponsors) - Arun and Mat emailed.
    • Are Millipore still a sponsor? - Arun emailed.
  • Lab PC still needs drivers installed - students account not admin.
  • T-shirts to be designed.

New action points

  • Design biobricks and primers in Sequencher.
  • Submit Preliminary Project Track details to iGEM HQ by 7 August (TOMORROW!).
  • Change NheI cutsite with another cutsite in teh dsigns sine it is used in the integration vectors
  • Find the integration vector to use at the lab

Minutes




News

Events

Social Net

  • Newcastle iGEM Twitter
  • [http://www.facebook.com/home.php#/group.php?gid=131709337641 Newcastle on Facebook]
  • [http://www.youtube.com/user/newcastle2009igem Newcastle Youtube Channel]