Team:Groningen/Project Plan/Elaboration/1
From 2009.igem.org
(Difference between revisions)
(→Plan: Roughly divided tasks over different roles.) |
(→Plan: Some tasks.) |
||
Line 15: | Line 15: | ||
** Role not used (yet). | ** Role not used (yet). | ||
* [[:Category:Team:Groningen/Roles/Configuration Manager|Configuration Manager]] | * [[:Category:Team:Groningen/Roles/Configuration Manager|Configuration Manager]] | ||
+ | ** {{todo}} [[Team:Groningen/Configuration Management Plan|Configuration Management Plan]] mostly done. | ||
* [[:Category:Team:Groningen/Roles/Designer|Designer]] | * [[:Category:Team:Groningen/Roles/Designer|Designer]] | ||
**'''Tasks:''' | **'''Tasks:''' | ||
Line 20: | Line 21: | ||
***Are there multiple BioBricks which can be used in case that one does not work. | ***Are there multiple BioBricks which can be used in case that one does not work. | ||
* [[:Category:Team:Groningen/Roles/Facility Manager|Facility Manager]] | * [[:Category:Team:Groningen/Roles/Facility Manager|Facility Manager]] | ||
+ | ** {{todo}} [[Team:Groningen/Configuration Management Plan|Configuration Management Plan]], at least the section "Tools, Environment, and Infrastructure" and "Configuration Identification" where applicable (and anything else needed to establish some basic procedures/conventions for our lab work). | ||
* [[:Category:Team:Groningen/Roles/Implementer|Implementer]] | * [[:Category:Team:Groningen/Roles/Implementer|Implementer]] | ||
**'''Objective:''' Have started with preparation labwork. | **'''Objective:''' Have started with preparation labwork. |
Revision as of 13:27, 3 June 2009
[http://2009.igem.org/Team:Groningen http://2009.igem.org/wiki/images/f/f1/Igemhomelogo.png]
|
|
|
---|
Plan
End date: 2009-06-01
Overall objective: The initial design should be made, the requirements refined. Some initial model prototypes should be made to gain experience in modelling.
Tasks per role:
- Analyst
- Objective: Project requirements, feasibility and detailed project vision should be finished.
- Tasks:
- Change Control Manager
- Role not used (yet).
- Configuration Manager
- TODO Configuration Management Plan mostly done.
- Designer
- Tasks:
- Which bacterial strains, vectors and genes are needed.
- Are there multiple BioBricks which can be used in case that one does not work.
- Tasks:
- Facility Manager
- TODO Configuration Management Plan, at least the section "Tools, Environment, and Infrastructure" and "Configuration Identification" where applicable (and anything else needed to establish some basic procedures/conventions for our lab work).
- Implementer
- Objective: Have started with preparation labwork.
- Tasks:
- What equipment is needed, communicate this with the facility manager.
- Order BioBrick restiction enzymes / ligases (fast-digest, Fermentas).
- Which chemicals / media are needed and can we use them from the MolGen department. Start ordering chemicals/media.
- Work out a cloning strategy, to check feasibility.
- Try to make a plan with project parts which can be done simultaneously.
- Integrator
- Modeller
- Project Manager
- Public Relations Officer
- Reviewer
- Scribe
- Stakeholder
- Tester
- Treasurer
- Tasks:
- Try to find protocols for the characterization, to check feasibility. ???
- Tasks:
Resources
[Resources needed for the iteration — material, human, financial, and so on.]
Use Cases
[List the use cases and scenarios that are being developed for this iteration.]
Evaluation Criteria
[Functionality, performance, capacity, quality measures, quality goals, and so forth.]
Retrieved from "http://2009.igem.org/Team:Groningen/Project_Plan/Elaboration/1"