Team:Newcastle/Labwork/18 September 2009
From 2009.igem.org
(Difference between revisions)
(→Stochastic switch team) |
(→Formal Lab Session - 18th September 2009) |
||
Line 5: | Line 5: | ||
[[Image:Team Newcastle 2009 iGEM ProbationaryP-Sign.PNG|50px|right]] | [[Image:Team Newcastle 2009 iGEM ProbationaryP-Sign.PNG|50px|right]] | ||
=Formal Lab Session - 18th September 2009= | =Formal Lab Session - 18th September 2009= | ||
- | ==<u>Stochastic | + | ==<u>Stochastic Switch Team</u>== |
Today we did midipreps of the ara transformation and digested 10ul to run on a gel (EcoRI + PstI) Two bands could be seen one for the backbone and one correctly sied for the insert (~200bp) so this midiprep can be taken forward in order to do the ara-sspb double clone. | Today we did midipreps of the ara transformation and digested 10ul to run on a gel (EcoRI + PstI) Two bands could be seen one for the backbone and one correctly sied for the insert (~200bp) so this midiprep can be taken forward in order to do the ara-sspb double clone. | ||
Line 15: | Line 15: | ||
* 80ul loading dye | * 80ul loading dye | ||
=400ul which was aliquoted into 4 tubes; 3 put in the freezer 1 in the fridge. | =400ul which was aliquoted into 4 tubes; 3 put in the freezer 1 in the fridge. | ||
- | + | <br> | |
+ | ==<u>Metal Sensing Team</u>== | ||
+ | ===Introduction=== | ||
+ | ===Practical Outline=== | ||
+ | ===Procedure=== | ||
<center> | <center> | ||
{|cellpadding="10" | {|cellpadding="10" |
Revision as of 12:47, 13 October 2009
Formal Lab Session - 18th September 2009
Stochastic Switch Team
Today we did midipreps of the ara transformation and digested 10ul to run on a gel (EcoRI + PstI) Two bands could be seen one for the backbone and one correctly sied for the insert (~200bp) so this midiprep can be taken forward in order to do the ara-sspb double clone.
Today we also made up some fresh DNA ladder as we have had problems with degradation.
- 40ul of 500ug/ml promega lambda HindIII digest (20ug in total)
- 280ul H2O
- 80ul loading dye
=400ul which was aliquoted into 4 tubes; 3 put in the freezer 1 in the fridge.
Metal Sensing Team
Introduction
Practical Outline
Procedure
|
|
|
News
Events
- 20 – 21 June 2009 - Europe workshop (London)
- 23 – 24 June 2009 - UK iGEM meetup (Edinburgh)
- 23 October Practice Presentation (Newcastle)
- 23 October T-shirts are ready
- 27 October Practice Presentation (Sunderland)
- 27 October Poster is ready
- 30 October – 2 November 2009 - Jamboree (Boston)
Social Net
- Newcastle iGEM Twitter
- [http://www.facebook.com/home.php#/group.php?gid=131709337641 Newcastle on Facebook]
- [http://www.youtube.com/user/newcastle2009igem Newcastle Youtube Channel]