Team:Newcastle/Meetings/6 August 2009

From 2009.igem.org

(Difference between revisions)
(New action points)
(Minutes)
Line 44: Line 44:
=== Minutes ===
=== Minutes ===
-
 
+
* We have been sent two strains in spore forms qnd they cannot germinate. In one of them, the spore coat is engineered and in the other one enzymes requierd the break the spore wall are not produced to prevent germination.
{{:Team:Newcastle/Footer}}
{{:Team:Newcastle/Footer}}
{{:Team:Newcastle/Right}}
{{:Team:Newcastle/Right}}

Revision as of 08:56, 13 August 2009


Contents

6 August 2009 - iGEM Meeting

  • Chair: James
  • Students:
  • Minutes: Goksel
  • Instructors:
  • Advisors:

Agenda

  • Lab Summary
  • Sequencher usage
    • Protocol for recovering sleB/cwlJ, given one is for cwlD only.
    • Do we need another RBS between GFP and KinA (multiple CDS).
    • Do we need GFP in the biobrick design at all? (SpoTeam)
  • Review last week's action points
  • Any questions

Action Points during last meeting

  • Ask about project description (Jess) - Done.
  • Send BioBrick design to Neil (All).
  • Ask Pr.Nigel Robinson if he wants to be an advisor (Mat) - Pending.
  • Think about the project title; BacMan,the Quest to Sequester? - Morgan likes, accepted.
  • Need to put more pictures on the wiki (Mat).
  • Collect pictures of the team from those who took pictures (Arun).
  • Write personal descriptions on the wiki and ask the instructors and advisor to do so (Arun) - Part done.
  • Have a look at the shuttle vector that Cambridge submitted last year (Leave for later).
  • Look at Groningen's BioBrick design (leave for later).
  • Need to set up a meeting with Noel from Sunderland (Goksel).
  • Put modelling stuff and presentations on the wiki (Mat).
  • Need to calculate how much the stochastic BioBrick will cost (Jess).
  • The need for more money (Sponsors) - Arun and Mat emailed.
    • Are Millipore still a sponsor? - Arun emailed.
  • Lab PC still needs drivers installed - students account not admin.
  • T-shirts to be designed.

New action points

  • Design biobricks and primers in Sequencher.
  • Submit Preliminary Project Track details to iGEM HQ by 7 August (TOMORROW!).
  • Change NheI cutsite with another cutsite in teh dsigns sine it is used in the integration vectors
  • Find the integration vector to use at the lab

Minutes

  • We have been sent two strains in spore forms qnd they cannot germinate. In one of them, the spore coat is engineered and in the other one enzymes requierd the break the spore wall are not produced to prevent germination.



News

Events

Social Net

  • Newcastle iGEM Twitter
  • [http://www.facebook.com/home.php#/group.php?gid=131709337641 Newcastle on Facebook]
  • [http://www.youtube.com/user/newcastle2009igem Newcastle Youtube Channel]