Team:UNICAMP-Brazil/Notebooks/August 15

From 2009.igem.org

(Difference between revisions)
(RBS and CFP plasmid digestion)
Line 10: Line 10:
* Today we started the construction of our first biobrick. After quantificate the miniprep's products (from 11/Aug) we performed the digestion (protocol Y) of plasmids containing the RBS and the CFP reporter.  
* Today we started the construction of our first biobrick. After quantificate the miniprep's products (from 11/Aug) we performed the digestion (protocol Y) of plasmids containing the RBS and the CFP reporter.  
-
* After the digestion we isolated the target bands from the agarose gel, according to the protocol X.  
+
* After the digestion we isolated the target bands from the agarose gel, according to the protocol 7.  
* The CFP digested band was correctly purified from the gel, unfortunatly we lost the RBS fragment. =( It must have been lost at some stage of the purification, therefore we could not ligate this two parts today.
* The CFP digested band was correctly purified from the gel, unfortunatly we lost the RBS fragment. =( It must have been lost at some stage of the purification, therefore we could not ligate this two parts today.

Revision as of 18:42, 26 September 2009

Topo l2.gif topo_r_igem.gif
topo_r_b.gif
Back to Calendar

YeastGuard

RBS and CFP plasmid digestion

  • Today we started the construction of our first biobrick. After quantificate the miniprep's products (from 11/Aug) we performed the digestion (protocol Y) of plasmids containing the RBS and the CFP reporter.
  • After the digestion we isolated the target bands from the agarose gel, according to the protocol 7.
  • The CFP digested band was correctly purified from the gel, unfortunatly we lost the RBS fragment. =( It must have been lost at some stage of the purification, therefore we could not ligate this two parts today.

Raíssa