Team:Groningen/Project Plan/Elaboration/1

From 2009.igem.org

Revision as of 14:06, 22 June 2009 by Jaspervdg (Talk | contribs)

[http://2009.igem.org/Team:Groningen http://2009.igem.org/wiki/images/f/f1/Igemhomelogo.png]

Plan

End date: 2009-06-01

Overall objective: The initial design should be made, the requirements refined. Some initial model prototypes should be made to gain experience in modelling.

Tasks per role:

  • Analyst
    • Objective: Project requirements, feasibility and detailed project vision should be finished.
    • Tasks:
  • Change Control Manager
    • Role not used (yet).
  • Configuration Manager
  • Designer
    • Tasks:
      • Which bacterial strains, vectors and genes are needed.
      • Are there multiple BioBricks which can be used in case that one does not work.
  • Facility Manager
    • TODO Configuration Management Plan, at least the section "Tools, Environment, and Infrastructure" and "Configuration Identification" where applicable (and anything else needed to establish some basic procedures/conventions for our lab work).
  • Implementer
    • Objective: Have started with preparation labwork.
    • Tasks:
      • What equipment is needed, communicate this with the facility manager.
      • Order BioBrick restiction enzymes / ligases (fast-digest, Fermentas).
      • Which chemicals / media are needed and can we use them from the MolGen department. Start ordering chemicals/media.
      • Work out a cloning strategy, to check feasibility.
      • Try to make a plan with project parts which can be done simultaneously.
  • Integrator
  • Modeller
  • Project Manager
  • Public Relations Officer
    • Objective: Get in contact with other teams and media
    • Tasks:
      • Get in contact with iGEM teams from Delft and Amsterdam, and organize a meeting at the end of June for trouble solving and getting to know eachother (Getting There)
      • Get in contact with the different "studie verenigingen" of the teammembers for publication of a short story about iGEM and the team (TODO)
  • Reviewer
  • Scribe
  • Stakeholder
  • Tester
  • Treasurer
    • Tasks:
      • Try to find protocols for the characterization, to check feasibility. ???

Resources

[Resources needed for the iteration — material, human, financial, and so on.]

Use Cases

[List the use cases and scenarios that are being developed for this iteration.]

Evaluation Criteria

[Functionality, performance, capacity, quality measures, quality goals, and so forth.]