Team:UNICAMP-Brazil/Notebooks/October 12
From 2009.igem.org
(Difference between revisions)
(New page: ==<html><script>var page = wgPageName.substr(30);document.write(page.replace(/_/, " "));</script></html>== {{:Team:UNICAMP-Brazil/inc_topo}} {{:Team:UNICAMP-Brazil/inc calendar}} __NOTOC...) |
(→finOP - Final Conclusion) |
||
Line 18: | Line 18: | ||
====finOP - Final Conclusion==== | ====finOP - Final Conclusion==== | ||
- | * After several unsuccessful attempts on constructing finOP's | + | * After several unsuccessful attempts on constructing finOP's biobricks, using different strategies with different backbones, our team decided to leave aside those biobricks. |
* Finalizing these parts will demand a lot of time, and we intend to already send our assembled biobricks this Thursday. | * Finalizing these parts will demand a lot of time, and we intend to already send our assembled biobricks this Thursday. | ||
* It's quite possible to fully assemble them, but we haven't enough time righ now. We got a lot of work to do related on characterizing our assembled biobricks and updating this wiki you are currently reading on. | * It's quite possible to fully assemble them, but we haven't enough time righ now. We got a lot of work to do related on characterizing our assembled biobricks and updating this wiki you are currently reading on. |
Revision as of 20:21, 18 October 2009
|