Team:Groningen/Project Plan/Elaboration/2

From 2009.igem.org

[http://2009.igem.org/Team:Groningen http://2009.igem.org/wiki/images/f/f1/Igemhomelogo.png]

Plan

End date: 2009-06-30

Overall objective: The initial design should be made, the requirements refined. Some initial model prototypes should be made to gain experience in modelling.

Tasks per role:

  • Analyst
  • Change Control Manager
    • Role not used (yet).
  • Configuration Manager
  • Designer
  • Facility Manager
  • Implementer
    • First parts of the project labwork should be finished successfully.
    • Which bacterial strains, vectors and genes are needed.
    • What equipment is needed, communicate this with the facility manager.
    • Are there multiple BioBricks which can be used in case that one does not work?
    • Order / ask for genes needed for the project.
    • Order BioBrick restiction enzymes / ligases (fast-digest, Fermentas).
    • Which chemicals / media are needed and can we use them from the MolGen department. Start ordering chemicals/media.
    • Work out a cloning strategy.
    • Get (everything) in the lab ready for the labwork
    • Try to make a plan with project parts which can be done simultaneously.
  • Integrator
  • Modeller
  • Project Manager
  • Public Relations Officer
    • Establish which day the meeting with team TUDelft and Amsterdam can be held
      • The idea is to have two meetings, one at the beginning of summer and one near the end (possibly in September)
      • The meetings will take place at the University of one of the teams participating and will possibly move to the city center to end with something to eat at a restaurant
      • The first meeting is meant to get to know one another, the projects with background information and helping with encountered problems (help in getting DNA, solutions to obstacles, etc.)
      • The second meeting is more oriented with respect to preparing for the Jamboree, in getting to practice presentations and receive feedback
      • And last, but not least, to have a great day and get to see the other University from a different angle
    • Establish contact with Newcastle University for possible collaboration on related project
    • Keep scanning the iGEM wikis for related projects
    • Check for correct lab insurance
    • Make a detailed plan of action on media to contect
  • Reviewer
  • Scribe
  • Stakeholder
  • Tester
  • Treasurer
    • Tickets and hostel should be booked by now.

Use Cases

[List the use cases and scenarios that are being developed for this iteration.]

Evaluation Criteria

[Functionality, performance, capacity, quality measures, quality goals, and so forth.]