Team:Groningen/Project Plan/Elaboration/2
From 2009.igem.org
(Difference between revisions)
(→Plan) |
|||
(9 intermediate revisions not shown) | |||
Line 1: | Line 1: | ||
- | <noinclude>{{Team:Groningen/Header}}{{doneCounter}} | + | <noinclude>{{Team:Groningen/Header}}{{doneCounter}}</noinclude> |
- | + | ||
- | + | ||
===Plan=== | ===Plan=== | ||
- | End date: 2009-06- | + | End date: 2009-06-30 |
Overall objective: The initial design should be made, the requirements refined. Some initial model prototypes should be made to gain experience in modelling. | Overall objective: The initial design should be made, the requirements refined. Some initial model prototypes should be made to gain experience in modelling. | ||
Line 16: | Line 14: | ||
* [[:Category:Team:Groningen/Roles/Facility Manager|Facility Manager]] | * [[:Category:Team:Groningen/Roles/Facility Manager|Facility Manager]] | ||
* [[:Category:Team:Groningen/Roles/Implementer|Implementer]] | * [[:Category:Team:Groningen/Roles/Implementer|Implementer]] | ||
+ | **First parts of the project labwork should be finished successfully. | ||
+ | **Which bacterial strains, vectors and genes are needed. | ||
+ | **What equipment is needed, communicate this with the facility manager. | ||
+ | **Are there multiple BioBricks which can be used in case that one does not work? | ||
+ | **Order / ask for genes needed for the project. | ||
+ | **Order BioBrick restiction enzymes / ligases (fast-digest, Fermentas). | ||
+ | **Which chemicals / media are needed and can we use them from the MolGen department. Start ordering chemicals/media. | ||
+ | **Work out a cloning strategy. | ||
+ | **Get (everything) in the lab ready for the labwork | ||
+ | **Try to make a plan with project parts which can be done simultaneously. | ||
+ | |||
* [[:Category:Team:Groningen/Roles/Integrator|Integrator]] | * [[:Category:Team:Groningen/Roles/Integrator|Integrator]] | ||
* [[:Category:Team:Groningen/Roles/Modeller|Modeller]] | * [[:Category:Team:Groningen/Roles/Modeller|Modeller]] | ||
* [[:Category:Team:Groningen/Roles/Project Manager|Project Manager]] | * [[:Category:Team:Groningen/Roles/Project Manager|Project Manager]] | ||
* [[:Category:Team:Groningen/Roles/Public Relations Officer|Public Relations Officer]] | * [[:Category:Team:Groningen/Roles/Public Relations Officer|Public Relations Officer]] | ||
- | + | **Establish which day the meeting with team TUDelft and Amsterdam can be held | |
- | + | ***The idea is to have two meetings, one at the beginning of summer and one near the end (possibly in September) | |
- | + | ***The meetings will take place at the University of one of the teams participating and will possibly move to the city center to end with something to eat at a restaurant | |
- | + | ***The first meeting is meant to get to know one another, the projects with background information and helping with encountered problems (help in getting DNA, solutions to obstacles, etc.) | |
- | + | ***The second meeting is more oriented with respect to preparing for the Jamboree, in getting to practice presentations and receive feedback | |
- | + | ***And last, but not least, to have a great day and get to see the other University from a different angle | |
- | + | **Establish contact with Newcastle University for possible collaboration on related project | |
- | + | **Keep scanning the iGEM wikis for related projects | |
+ | **Check for correct lab insurance | ||
+ | **Make a detailed plan of action on media to contect | ||
* [[:Category:Team:Groningen/Roles/Reviewer|Reviewer]] | * [[:Category:Team:Groningen/Roles/Reviewer|Reviewer]] | ||
* [[:Category:Team:Groningen/Roles/Scribe|Scribe]] | * [[:Category:Team:Groningen/Roles/Scribe|Scribe]] | ||
Line 33: | Line 44: | ||
* [[:Category:Team:Groningen/Roles/Tester|Tester]] | * [[:Category:Team:Groningen/Roles/Tester|Tester]] | ||
* [[:Category:Team:Groningen/Roles/Treasurer|Treasurer]] | * [[:Category:Team:Groningen/Roles/Treasurer|Treasurer]] | ||
- | + | **Tickets and hostel should be booked by now. | |
- | + | ||
- | + | ||
===Use Cases=== | ===Use Cases=== | ||
Line 42: | Line 51: | ||
===Evaluation Criteria=== | ===Evaluation Criteria=== | ||
[Functionality, performance, capacity, quality measures, quality goals, and so forth.] | [Functionality, performance, capacity, quality measures, quality goals, and so forth.] | ||
+ | {{Team:Groningen/Footer}} |
Latest revision as of 11:04, 30 September 2009
[http://2009.igem.org/Team:Groningen http://2009.igem.org/wiki/images/f/f1/Igemhomelogo.png]
|
---|
Plan
End date: 2009-06-30
Overall objective: The initial design should be made, the requirements refined. Some initial model prototypes should be made to gain experience in modelling.
Tasks per role:
- Analyst
- Change Control Manager
- Role not used (yet).
- Configuration Manager
- Designer
- Facility Manager
- Implementer
- First parts of the project labwork should be finished successfully.
- Which bacterial strains, vectors and genes are needed.
- What equipment is needed, communicate this with the facility manager.
- Are there multiple BioBricks which can be used in case that one does not work?
- Order / ask for genes needed for the project.
- Order BioBrick restiction enzymes / ligases (fast-digest, Fermentas).
- Which chemicals / media are needed and can we use them from the MolGen department. Start ordering chemicals/media.
- Work out a cloning strategy.
- Get (everything) in the lab ready for the labwork
- Try to make a plan with project parts which can be done simultaneously.
- Integrator
- Modeller
- Project Manager
- Public Relations Officer
- Establish which day the meeting with team TUDelft and Amsterdam can be held
- The idea is to have two meetings, one at the beginning of summer and one near the end (possibly in September)
- The meetings will take place at the University of one of the teams participating and will possibly move to the city center to end with something to eat at a restaurant
- The first meeting is meant to get to know one another, the projects with background information and helping with encountered problems (help in getting DNA, solutions to obstacles, etc.)
- The second meeting is more oriented with respect to preparing for the Jamboree, in getting to practice presentations and receive feedback
- And last, but not least, to have a great day and get to see the other University from a different angle
- Establish contact with Newcastle University for possible collaboration on related project
- Keep scanning the iGEM wikis for related projects
- Check for correct lab insurance
- Make a detailed plan of action on media to contect
- Establish which day the meeting with team TUDelft and Amsterdam can be held
- Reviewer
- Scribe
- Stakeholder
- Tester
- Treasurer
- Tickets and hostel should be booked by now.
Use Cases
[List the use cases and scenarios that are being developed for this iteration.]
Evaluation Criteria
[Functionality, performance, capacity, quality measures, quality goals, and so forth.]