This is the iteration plan for the second Inception iteration, see the general Inception page for milestones.
Plan
End date: 2009-05-18
Overall objective: Choose idea we're going to work on. The most important requirements should be identified.
Tasks per role:
- Analyst
- Change Control Manager
- Role not used (yet).
- Configuration Manager
- Basic wiki finished.
- DONE Front page
- DONE Some categories
- ???
- TODO Survey possibilities wiki and mathworks
- ???
- Change Request
- Not used (yet).
- Project Repository
- DONE Rough structure for Wiki.
- DONE Guidelines for what should go on what medium (Wiki/Google Docs/Network drive).
- ?
- Basic wiki finished.
- Designer
- Facility Manager
- Implementer
- Integrator
- Modeller
- Project Manager
- Public Relations Officer
- Reviewer
- Scribe
- Stakeholder
- Tester
- Treasurer
Resources
[Resources needed for the iteration — material, human, financial, and so on.]
Use Cases
[List the use cases and scenarios that are being developed for this iteration.]
Evaluation Criteria
[Functionality, performance, capacity, quality measures, quality goals, and so forth.]