Stochastic switch team

Today we ran the minipreps for sac and ara transformed cells however- perhaps due to poor miniprep procedure- the sac test digest yeilded poor results, however the ara transformants miniprep gave a ~200bp band along with the backbone in 8/12 lanes:

Team NewcastleAra 170909.png


Midi prep cultures were set up using cultures corresponding to lanes 1 and 3 for ara.

To test whether the poor sac result was due to the miniprep more miniprep cultures were set up to do tomorrow.

Today also we did fragment preps for Goksels sspb the ara fragment, and a cwlJ fragment for Hanny:

Team NewcFragpreps1.png

Metal Sensing Team

Introduction

In yesterday's lab session the Metal Sensing team carried out mini-preps on the 12 colonies of potential cotC-GFP-smtA E. coli transformants and analysed them. Despite them showing incorrectly sized bands when digested and ran on gel, the team proceded to carry out preparations to midi-prep colony 8 on the basis of consistency of the band patterns and the theory that the digests may not have worked properly. The midi-prep will be done today.

The team also prepared to ligate the cadA promoter to the BBa_J33206 BioBrick (which contains the arsR gene and arsR binding site and has the promoter cut out) but only got as far as digesting the two fragments. The cadmium-sensor has been put on hold as of the General Meeting on 16/09/09.

Additionally the metal sensing team prepared for transformation in Bacillus subtilis by carrying out the evening steps of the protocol - this will mean that if the midi-preps are a success then B. subtilis can be transformed with cotC-GFP-smtA in pMUTIN4 today!

Today's lab work will focus on midi-prepping colony 8 (which is a potential cotC-GFP-smtA transformant E. coli colony). The DNA will then be analysed by digesting a sample with BamHI and HindIII and running it on agarose gel through DNA gel electrophoresis. If successful, the DNA will be used to transform B. subtilis cells; if unsuccessful the ligations of pMUTIN4 to cotC-GFP-smtA will have to be repeated on another day.

Practical Outline

The tasks the Metal Sensing team hope to carry out by the end of the day include the following:

  1. Midi-prep colony 8 of the potential cotC-GFP-smtA transformant E. coli DH5-alpha cells.
  2. Digest the midi-prepped DNA with BamHI and HindIII
  3. Analyse the digested products through DNA gel electrophoresis:
    1. If successful, use midi-prepped DNA to transform Bacillus subtilis
    2. If unsuccessful, prepare to carry out a second attempt at ligating cotC-GFP-smtA to pMUTIN4.


Procedure


July
MTWTFSS
    1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
August
MTWTFSS
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31
September
MTWTFSS
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30



News

Events

Social Net

  • Newcastle iGEM Twitter
  • Newcastle on Facebook
  • Newcastle Youtube Channel