Team:Newcastle/Labwork/22 September 2009

From 2009.igem.org

(Difference between revisions)
(Chassis team)
(Conclusion)
Line 48: Line 48:
<br>
<br>
-
[[Image:|400px|center]]
+
[[Image:Team_newcastle_2009_hanny_geldoc_220909_1.jpg‎ |400px|center]]

Revision as of 02:49, 21 October 2009


Team Newcastle 2009 iGEM ProbationaryP-Sign.PNG

Formal Lab Session - 22nd September 2009

Stochastic switch team

Today we transformed E.coli JM109 cels with the overnight ligation product from yesterday using the promega protocol. We used the following controls:

  • Tube 1: Backbone + insert + ligase (proper ligation)
  • Tube 2: Backbone + ligase (control for background ligation level)
  • Tube 3: Backbone + insert (control for ligase effectiveness)

These were left in the incubator for an hour and then plated out (2 plates per tube 200ul and 50ul) onto Amp + Tet LB plated and put in the 37C incubator overnight.

Today again we redid the digests of the sac miniprep however again there was no DNA present.

Chassis team

Introduction

  • After overnight culture of cells for Midi Prep, today we need Midi Prep L1 and L2 plasmid and digest the plasmid to check the Midi prep result.


Experiment procedure

Midi prep L1(pSB1AT3:cwlJ) and L2(pSB1AT3:cwlJ:sleB)

  • Before we carried out Midi Prep, we take out 1ml of cell mix and put them into 1.5ml eppendorf tube to keep in fridge.
  • 50ml of cells were used for Midi Prep.
  • Midi prep processed by following the standard protocal of Plasmid Midi Prep Kit(Sigma).

Digest Midi prep result

  • Using the same reaction volume as day 18/09/09

Conclusion

  • Both Midi prep for L1 and L1 are right plasmid.
  • Nano dorp of our fragments and plasmid.
 cwlJ:sleB fragment 53.5ng/ul
 (after PCR using primer cwlJsleBForward and cwlJsleBReverse)
   
 pMutin4 after digestion with HindIII and BamHI 24.9ng/ul
 L1 Midi (plasmid pSB1AT3:cwlJ)  76.9ng/ul
 L2 Midi (plasmid pSB1AT3:cwlJ:sleB) 55.0ng/ul
 kinA fragment after digest(EcoRI and NheI) and gel extraction  6.1ng/ul


Team newcastle 2009 hanny geldoc 220909 1.jpg


July
MTWTFSS
    1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
August
MTWTFSS
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31
September
MTWTFSS
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30
October
MTWTFSS
      1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31



News

Events

Social Net

  • Newcastle iGEM Twitter
  • Newcastle on Facebook
  • Newcastle Youtube Channel