Team:TUDelft/30 July 2009

From 2009.igem.org

(Difference between revisions)
(30 July 2009)
Line 8: Line 8:
prepared assembly mixes for !B, !C and !D constructs.
prepared assembly mixes for !B, !C and !D constructs.
 +
 +
 +
===Calin===
 +
Plated three backbones left over from the transformation the other day. Did a digest on oriT-R with E and P.
 +
 +
 +
===Tim Vos===
 +
Minipreped pSB4C5, pSB.
 +
 +
{{Template:TUDelftiGEM2009_end}}
{{Template:TUDelftiGEM2009_end}}

Revision as of 12:00, 30 July 2009

Lab Notebook

July
MTWTFSS
    1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
August
MTWTFSS
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31
September
MTWTFSS
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30
October
MTWTFSS
      1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
 

30 July 2009

Tim Weenink

prepared assembly mixes for !B, !C and !D constructs.


Calin

Plated three backbones left over from the transformation the other day. Did a digest on oriT-R with E and P.


Tim Vos

Minipreped pSB4C5, pSB.