Team:TUDelft/2 September 2009

From 2009.igem.org

(Difference between revisions)
(Tim Weenink)
(2 September 2009)
 
Line 4: Line 4:
='''2 September 2009'''=
='''2 September 2009'''=
 +
===Sriram===
 +
Today I did miniprep to continue my assembly of riboregulator and locks and keys. I did restriction and ran a gel today to verify it (see below). Then also I continued with ligation and electro transformation of the products.
 +
 +
[[Image:SriramTim020909.jpg|thumb|center|450px]]
===Tim Weenink===
===Tim Weenink===

Latest revision as of 23:00, 21 October 2009

Lab Notebook

July
MTWTFSS
    1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
August
MTWTFSS
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31
September
MTWTFSS
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30
October
MTWTFSS
      1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
 

2 September 2009

Sriram

Today I did miniprep to continue my assembly of riboregulator and locks and keys. I did restriction and ran a gel today to verify it (see below). Then also I continued with ligation and electro transformation of the products.

SriramTim020909.jpg

Tim Weenink

Ligation of !SIII: placI upstream, *T1 (I-SceI) downstream, pSB1C3 backbone. Also did yesterdays ligation (!P) again, because the PCR machine was set to a ligation temp of 37 degrees, where it should be 20.

I inoculated the K12 strain in liquid culture for preparation of competent cells tomorrow.

also did a gel to check all the above.

Tim020909.png