Team:Groningen/Notebook/21 July 2009

From 2009.igem.org

(Difference between revisions)
(PCR1)
(HmtA)
Line 11: Line 11:
Therefor we will redesign the cloning. The Forward primer will be modified into 2 part. which will require an additional PCR but increases the chance of getting product.
Therefor we will redesign the cloning. The Forward primer will be modified into 2 part. which will require an additional PCR but increases the chance of getting product.
-
[[image:F102471_2009-07-21_01hr_30min_PCR1GelMislukt.jpg‎ ]]
+
[[image:HmtA-cloningplan.JPG |600px| ]]
===Metal Accumulation===
===Metal Accumulation===

Revision as of 12:16, 21 July 2009

Igemhomelogo.png

Wet

GVP Cluster

Transporters

HmtA
F102471 2009-07-21 01hr 30min PCR1GelMislukt.jpg

The band at ~1150 kb was cut out of the gel and used for pcr described yesterday gave poor results. No band of expected size and strong primerdimer bands Therefor we will redesign the cloning. The Forward primer will be modified into 2 part. which will require an additional PCR but increases the chance of getting product.

HmtA-cloningplan.JPG

Metal Accumulation

Vectors

Dry

April
MTWTFSS
    1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30
May
MTWTFSS
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
June
MTWTFSS
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30
July
MTWTFSS
    1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
August
MTWTFSS
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31
September
MTWTFSS
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30
October
MTWTFSS
      1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
November
MTWTFSS
            1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30